Solar power plant, California
Scarlet Solar power plant, California
Scarlet Solar (CA) is a 240 MW power plant, 200 MW of it solar, in Fresno County, California, operated by EDP Renewables North America LLC, and it generated 480,792 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in California, and its capacity factor sits at the 82nd percentile of U.S. solar plants. By 2025 generation it ranks 1,381st of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Scarlet Solar (CA) plant run compared with other solar plants?
The Scarlet Solar (CA) plant's solar units had a capacity factor of 28% in 2025 on 200 MW of net summer capacity, the 82nd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 102 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Scarlet Solar (CA) | 28% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.
Is the Scarlet Solar (CA) plant generating more or less than last year?
Scarlet Solar (CA) generated 480,792 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 3.1% behind the same months of 2025. 2024 has output for only 7 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 263,293 |
| 2025 | 480,792 |
| 2026 through August | 358,172 |
| 2025, same months | 369,648 |
Monthly generation, Jun 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 46,684 |
| July 2026 | 58,099 |
| June 2026 | 58,022 |
| May 2026 | 53,225 |
| April 2026 | 47,891 |
| March 2026 | 45,330 |
| February 2026 | 27,251 |
| January 2026 | 21,670 |
| December 2025 | 10,589 |
| November 2025 | 18,241 |
| October 2025 | 39,975 |
| September 2025 | 42,339 |
| August 2025 | 57,727 |
| July 2025 | 61,513 |
| June 2025 | 56,810 |
| May 2025 | 55,456 |
| April 2025 | 36,605 |
| March 2025 | 38,633 |
| February 2025 | 32,036 |
| January 2025 | 30,868 |
| December 2024 | 19,835 |
| November 2024 | 28,685 |
| October 2024 | 38,599 |
| September 2024 | 52,063 |
| August 2024 | 56,302 |
| July 2024 | 40,409 |
| June 2024 | 27,400 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Scarlet Solar (CA) plant, and when do they retire?
2 operable generators total 240 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 2 | 240 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GEN01 | Operating | Solar Photovoltaic | 200 | 2024 | n/a |
| GEN02 | Operating | Batteries | 40 | 2024 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Scarlet Solar (CA) plant?
EIA lists no joint owners for Scarlet Solar (CA). EDP Renewables North America LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Scarlet Solar (CA) plant use?
Scarlet Solar (CA) has capacity on 2 fuels: 83% solar and 17% battery and pumped storage. In 2025, solar made 102% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Solar | 200 | 83.3% | 488,817 |
| Battery and pumped storage | 40 | 16.7% | -8,025 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Scarlet Solar (CA) plant?
Scarlet Solar (CA) is in Fresno, Fresno County, California, at 36.5975° N, 120.3623° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Scarlet Solar (CA)'s 200 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Great Valley Solar Portfolio Holdings, L | Fresno | 203 | 503,173 |
| Wright Solar Park | Merced | 200 | 402,717 |
| SE Athos II, LLC | Riverside | 200 | 561,991 |
| Scarlet Solar (CA) | Fresno | 200 | 488,817 |
| Sandrini Solar 200 | Kern | 200 | 411,296 |
| Victory Pass | Riverside | 200 | 585,624 |
| Scarlet II Hybrid | Fresno | 200 | 403,487 |
Source: EIA Forms EIA-860 and EIA-923, 2025.