Skip to main content
RateWatt

Solar power plant, California

Scarlet Solar power plant, California

Scarlet Solar (CA) is a 240 MW power plant, 200 MW of it solar, in Fresno County, California, operated by EDP Renewables North America LLC, and it generated 480,792 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in California, and its capacity factor sits at the 82nd percentile of U.S. solar plants. By 2025 generation it ranks 1,381st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

240 MWNameplate capacity
28%Capacity factor, 2025, solar units, 82nd percentile, on 200 MW net summer
0.2%Of CA generation, 2025
1 yearAverage generator age, by MW

How hard does the Scarlet Solar (CA) plant run compared with other solar plants?

The Scarlet Solar (CA) plant's solar units had a capacity factor of 28% in 2025 on 200 MW of net summer capacity, the 82nd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 102 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Scarlet Solar (CA)28%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Scarlet Solar (CA) plant generating more or less than last year?

Scarlet Solar (CA) generated 480,792 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 3.1% behind the same months of 2025. 2024 has output for only 7 months, so the two years are not compared.

Net generation by period
PeriodMWh
2024263,293
2025480,792
2026 through August358,172
2025, same months369,648
Monthly generation, Jun 2024 to Aug 2026
MonthMWh
August 202646,684
July 202658,099
June 202658,022
May 202653,225
April 202647,891
March 202645,330
February 202627,251
January 202621,670
December 202510,589
November 202518,241
October 202539,975
September 202542,339
August 202557,727
July 202561,513
June 202556,810
May 202555,456
April 202536,605
March 202538,633
February 202532,036
January 202530,868
December 202419,835
November 202428,685
October 202438,599
September 202452,063
August 202456,302
July 202440,409
June 202427,400

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Scarlet Solar (CA) plant?

Scarlet Solar (CA) made 0.2% of the 204,542,898 MWh reported by California plants in 2025, from 0.2% of the state's 107,433 MW of capacity. By capacity it is the 112th largest of 1,877 plants in California, the 1,316th largest of 14,327 in the U.S. and the 157th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 87th largest of 1,608 generating plants in the state.

Scarlet Solar (CA) within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)240107,4330.2%
Generation (MWh)480,792204,542,8980.2%
Solar capacity (MW)20024,6630.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Scarlet Solar (CA) plant, and when do they retire?

2 operable generators total 240 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2240100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN01OperatingSolar Photovoltaic2002024n/a
GEN02OperatingBatteries402024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Scarlet Solar (CA) plant?

EIA lists no joint owners for Scarlet Solar (CA). EDP Renewables North America LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Scarlet Solar (CA) plant use?

Scarlet Solar (CA) has capacity on 2 fuels: 83% solar and 17% battery and pumped storage. In 2025, solar made 102% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar20083.3%488,817
Battery and pumped storage4016.7%-8,025

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Scarlet Solar (CA) plant?

Scarlet Solar (CA) is in Fresno, Fresno County, California, at 36.5975° N, 120.3623° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Scarlet Solar (CA)'s 200 MW is 1% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Great Valley Solar Portfolio Holdings, LFresno203503,173
Wright Solar ParkMerced200402,717
SE Athos II, LLCRiverside200561,991
Scarlet Solar (CA)Fresno200488,817
Sandrini Solar 200Kern200411,296
Victory PassRiverside200585,624
Scarlet II HybridFresno200403,487

Source: EIA Forms EIA-860 and EIA-923, 2025.