Solar power plant, Kentucky
Sebree Solar I power plant, Kentucky
Sebree Solar I is a 250 MW solar power plant in Henderson County, Kentucky, operated by Sebree Solar, LLC, and it generated 151,534 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Kentucky, and its capacity factor sits at the 6th percentile of U.S. solar plants. By 2025 generation it ranks 2,888th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Sebree Solar I plant run compared with other solar plants?
The Sebree Solar I plant had a capacity factor of 7% in 2025 on 250 MW of net summer capacity, the 6th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 25 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Sebree Solar I | 7% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Sebree Solar I plant generating more or less than last year?
Sebree Solar I generated 151,534 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 1552.3% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 151,534 |
| 2026 through August | 352,399 |
| 2025, same months | 21,328 |
Monthly generation, Jul 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 54,179 |
| July 2026 | 48,119 |
| June 2026 | 51,695 |
| May 2026 | 45,359 |
| April 2026 | 49,903 |
| March 2026 | 43,773 |
| February 2026 | 32,878 |
| January 2026 | 26,493 |
| December 2025 | 20,938 |
| November 2025 | 26,342 |
| October 2025 | 41,475 |
| September 2025 | 41,451 |
| August 2025 | 20,760 |
| July 2025 | 568 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Sebree Solar I plant, and when do they retire?
1 operable generator totals 250 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 250 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 4516 | Operating | Solar Photovoltaic | 250 | 2025 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Sebree Solar I plant?
EIA lists no joint owners for Sebree Solar I. Sebree Solar, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Sebree Solar I plant?
Sebree Solar I is in Robards, Henderson County, Kentucky, at 37.6930° N, 87.5490° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Kentucky are similar in size?
Kentucky has 18 operable solar plants with 1,127 MW of capacity, and Sebree Solar I's 250 MW is 22% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Sebree Solar I | Henderson | 250 | 151,534 |
| Green River Solar | Meade | 200 | 270,969 |
| SR Russellville | Logan | 173 | 343,713 |
| Unbridled Solar | Henderson | 160 | 311,763 |
Source: EIA Forms EIA-860 and EIA-923, 2025.