Solar power plant, Kentucky
Unbridled Solar power plant, Kentucky
Unbridled Solar is a 160 MW solar power plant in Henderson County, Kentucky, operated by Geronimo Power, and it generated 311,763 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in Kentucky, and its capacity factor sits at the 43rd percentile of U.S. solar plants. By 2025 generation it ranks 1,927th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Unbridled Solar plant run compared with other solar plants?
The Unbridled Solar plant had a capacity factor of 22% in 2025 on 160 MW of net summer capacity, the 43rd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 81 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Unbridled Solar | 22% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Unbridled Solar plant generating more or less than last year?
Unbridled Solar generated 311,763 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 1.9% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 311,763 |
| 2026 through August | 238,064 |
| 2025, same months | 233,674 |
Monthly generation, Jan 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 36,722 |
| July 2026 | 37,371 |
| June 2026 | 37,560 |
| May 2026 | 34,209 |
| April 2026 | 33,155 |
| March 2026 | 26,381 |
| February 2026 | 17,414 |
| January 2026 | 15,252 |
| December 2025 | 9,771 |
| November 2025 | 13,815 |
| October 2025 | 23,787 |
| September 2025 | 30,716 |
| August 2025 | 37,776 |
| July 2025 | 37,763 |
| June 2025 | 35,729 |
| May 2025 | 32,079 |
| April 2025 | 31,897 |
| March 2025 | 26,471 |
| February 2025 | 17,320 |
| January 2025 | 14,639 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Unbridled Solar plant, and when do they retire?
1 operable generator totals 160 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 160 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| UBSLR | Operating | Solar Photovoltaic | 160 | 2025 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Unbridled Solar plant?
EIA lists no joint owners for Unbridled Solar. Geronimo Power operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Unbridled Solar plant?
Unbridled Solar is in Robards, Henderson County, Kentucky, at 37.6520° N, 87.5520° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Kentucky are similar in size?
Kentucky has 18 operable solar plants with 1,127 MW of capacity, and Unbridled Solar's 160 MW is 14% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Sebree Solar I | Henderson | 250 | 151,534 |
| Green River Solar | Meade | 200 | 270,969 |
| SR Russellville | Logan | 173 | 343,713 |
| Unbridled Solar | Henderson | 160 | 311,763 |
| Martin County Solar Project, LLC | Martin | 111 | 210,877 |
| Bluebird Solar LLC | Harrison | 100 | 54,199 |
Source: EIA Forms EIA-860 and EIA-923, 2025.