Solar power plant, Kentucky
Green River Solar power plant, Kentucky
Green River Solar is a 200 MW solar power plant in Meade County, Kentucky, operated by Green River Solar, LLC, and it generated 270,969 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in Kentucky, and its capacity factor sits at the 12th percentile of U.S. solar plants. By 2025 generation it ranks 2,105th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Green River Solar plant run compared with other solar plants?
The Green River Solar plant had a capacity factor of 15% in 2025 on 200 MW of net summer capacity, the 12th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 56 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Green River Solar | 15% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Green River Solar plant generating more or less than last year?
Green River Solar generated 270,969 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 73.3% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 270,969 |
| 2026 through August | 278,002 |
| 2025, same months | 160,430 |
Monthly generation, May 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 41,004 |
| July 2026 | 41,524 |
| June 2026 | 39,858 |
| May 2026 | 39,826 |
| April 2026 | 36,511 |
| March 2026 | 34,533 |
| February 2026 | 25,272 |
| January 2026 | 19,474 |
| December 2025 | 14,580 |
| November 2025 | 21,468 |
| October 2025 | 34,851 |
| September 2025 | 39,640 |
| August 2025 | 45,222 |
| July 2025 | 45,301 |
| June 2025 | 41,474 |
| May 2025 | 28,433 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Green River Solar plant, and when do they retire?
1 operable generator totals 200 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 200 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 4598 | Operating | Solar Photovoltaic | 200 | 2025 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Green River Solar plant?
EIA lists no joint owners for Green River Solar. Green River Solar, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Green River Solar plant?
Green River Solar is in Guston, Meade County, Kentucky, at 37.9099° N, 86.2601° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Kentucky are similar in size?
Kentucky has 18 operable solar plants with 1,127 MW of capacity, and Green River Solar's 200 MW is 18% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Sebree Solar I | Henderson | 250 | 151,534 |
| Green River Solar | Meade | 200 | 270,969 |
| SR Russellville | Logan | 173 | 343,713 |
| Unbridled Solar | Henderson | 160 | 311,763 |
| Martin County Solar Project, LLC | Martin | 111 | 210,877 |
Source: EIA Forms EIA-860 and EIA-923, 2025.