Wind power plant, Texas
Seymour Hills Wind Project, LLC power plant, Texas
Seymour Hills Wind Project, LLC is a 30.2 MW wind power plant in Baylor County, Texas, operated by Engie North America, and it generated 119,294 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 91st percentile of U.S. wind plants. By 2025 generation it ranks 3,207th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Seymour Hills Wind Project, LLC plant run compared with other wind plants?
The Seymour Hills Wind Project, LLC plant had a capacity factor of 45% in 2025 on 30.2 MW of net summer capacity, the 91st percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 165 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Seymour Hills Wind Project, LLC | 45% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Seymour Hills Wind Project, LLC plant generating more or less than last year?
Generation at Seymour Hills Wind Project, LLC fell 8.2% from 2024 to 2025, from 129,914 MWh to 119,294 MWh. Through August 2026 it is running 24.8% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 129,914 |
| 2025 | 119,294 |
| 2026 through August | 95,562 |
| 2025, same months | 76,574 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 11,000 |
| July 2026 | 10,110 |
| June 2026 | 11,862 |
| May 2026 | 10,823 |
| April 2026 | 13,504 |
| March 2026 | 14,900 |
| February 2026 | 10,587 |
| January 2026 | 12,776 |
| December 2025 | 13,199 |
| November 2025 | 10,828 |
| October 2025 | 10,709 |
| September 2025 | 7,984 |
| August 2025 | 7,525 |
| July 2025 | 10,352 |
| June 2025 | 12,113 |
| May 2025 | 10,382 |
| April 2025 | 13,920 |
| February 2025 | 10,746 |
| January 2025 | 11,536 |
| December 2024 | 10,560 |
| November 2024 | 12,407 |
| October 2024 | 9,148 |
| September 2024 | 7,238 |
| August 2024 | 9,913 |
| July 2024 | 9,618 |
| June 2024 | 10,176 |
| May 2024 | 10,183 |
| April 2024 | 13,242 |
| March 2024 | 14,256 |
| February 2024 | 12,625 |
| January 2024 | 10,548 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Seymour Hills Wind Project, LLC plant, and when do they retire?
1 operable generator totals 30.2 MW, with an average age of 6 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 30 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| WTGS | Operating | Onshore Wind Turbine | 30 | 2019 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Seymour Hills Wind Project, LLC plant?
Seymour Hills Wind Project, LLC is the only joint owner reported for Seymour Hills Wind Project, LLC, with 100.0%. Engie North America operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Seymour Hills Wind Project, LLC plant?
Seymour Hills Wind Project, LLC is in Seymour, Baylor County, Texas, at 33.5782° N, 99.1921° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Texas are similar in size?
Texas has 228 operable wind plants with 43,942 MW of capacity, and Seymour Hills Wind Project, LLC's 30.2 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Sunray Wind I | Moore | 50 | 131,397 |
| Sweetwater Wind 1 LLC | Nolan | 38 | 138,212 |
| Big Spring Wind Power Facility | Howard | 34 | 56,793 |
| Seymour Hills Wind Project, LLC | Baylor | 30 | 119,294 |
| Mozart Wind Farm | Kent & Stonewall | 30 | 49,531 |
| Pleasant Hill Wind Energy Project | Crosby | 20 | 32,958 |
Source: EIA Forms EIA-860 and EIA-923, 2025.