Wind power plant, Texas
Sweetwater Wind 1 LLC power plant, Texas
Sweetwater Wind 1 LLC is a 37.5 MW wind power plant in Nolan County, Texas, operated by Leeward Asset Management, LLC, and it generated 138,212 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 82nd percentile of U.S. wind plants. By 2025 generation it ranks 3,025th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Sweetwater Wind 1 LLC plant run compared with other wind plants?
The Sweetwater Wind 1 LLC plant had a capacity factor of 42% in 2025 on 37.5 MW of net summer capacity, the 82nd percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 154 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Sweetwater Wind 1 LLC | 42% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Sweetwater Wind 1 LLC plant generating more or less than last year?
Generation at Sweetwater Wind 1 LLC fell 1.9% from 2024 to 2025, from 140,839 MWh to 138,212 MWh.
| Period | MWh |
|---|---|
| 2024 | 140,839 |
| 2025 | 138,212 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 13,728 |
| November 2025 | 11,694 |
| October 2025 | 11,931 |
| September 2025 | 8,045 |
| August 2025 | 7,745 |
| July 2025 | 12,697 |
| June 2025 | 13,378 |
| May 2025 | 9,186 |
| April 2025 | 14,398 |
| March 2025 | 14,742 |
| February 2025 | 9,990 |
| January 2025 | 10,678 |
| December 2024 | 11,730 |
| November 2024 | 13,414 |
| October 2024 | 12,369 |
| September 2024 | 6,304 |
| August 2024 | 9,528 |
| July 2024 | 9,985 |
| June 2024 | 13,211 |
| May 2024 | 12,522 |
| April 2024 | 15,235 |
| March 2024 | 12,131 |
| February 2024 | 13,729 |
| January 2024 | 10,681 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Sweetwater Wind 1 LLC plant, and when do they retire?
1 operable generator totals 37.5 MW, with an average age of 22 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 1 | 38 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| SW1 | Operating | Onshore Wind Turbine | 38 | 2003 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Sweetwater Wind 1 LLC plant?
EIA lists no joint owners for Sweetwater Wind 1 LLC. Leeward Asset Management, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Sweetwater Wind 1 LLC plant?
Sweetwater Wind 1 LLC is in Sweetwater, Nolan County, Texas, at 32.3606° N, 100.3389° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Texas are similar in size?
Texas has 228 operable wind plants with 43,942 MW of capacity, and Sweetwater Wind 1 LLC's 37.5 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Cotton Plains Wind Farm | Floyd | 50 | 181,894 |
| Hidalgo Wind Farm II | Hidalgo | 50 | 152,788 |
| Sunray Wind I | Moore | 50 | 131,397 |
| Sweetwater Wind 1 LLC | Nolan | 38 | 138,212 |
| Big Spring Wind Power Facility | Howard | 34 | 56,793 |
| Seymour Hills Wind Project, LLC | Baylor | 30 | 119,294 |
| Mozart Wind Farm | Kent & Stonewall | 30 | 49,531 |
Source: EIA Forms EIA-860 and EIA-923, 2025.