Wind power plant, Texas
Sunray Wind I power plant, Texas
Sunray Wind I is a 49.5 MW wind power plant in Moore County, Texas, operated by Diamond Shamrock Refining Company LP, and it generated 131,397 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 40th percentile of U.S. wind plants. By 2025 generation it ranks 3,092nd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Sunray Wind I plant run compared with other wind plants?
The Sunray Wind I plant had a capacity factor of 30% in 2025 on 49.5 MW of net summer capacity, the 40th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 111 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Sunray Wind I | 30% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Sunray Wind I plant generating more or less than last year?
Generation at Sunray Wind I rose 1.3% from 2024 to 2025, from 129,718 MWh to 131,397 MWh.
| Period | MWh |
|---|---|
| 2024 | 129,718 |
| 2025 | 131,397 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 13,067 |
| November 2025 | 11,419 |
| October 2025 | 11,790 |
| September 2025 | 6,886 |
| August 2025 | 3,188 |
| July 2025 | 9,462 |
| June 2025 | 9,906 |
| May 2025 | 10,368 |
| April 2025 | 14,696 |
| March 2025 | 15,730 |
| February 2025 | 12,058 |
| January 2025 | 12,827 |
| December 2024 | 13,185 |
| November 2024 | 13,335 |
| October 2024 | 12,545 |
| September 2024 | 9,524 |
| August 2024 | 7,877 |
| July 2024 | 11,092 |
| June 2024 | 11,395 |
| May 2024 | 12,682 |
| April 2024 | 13,958 |
| March 2024 | 11,791 |
| February 2024 | 9,421 |
| January 2024 | 2,913 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Sunray Wind I plant, and when do they retire?
1 operable generator totals 49.5 MW, with an average age of 16 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 1 | 50 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| WND1 | Operating | Onshore Wind Turbine | 50 | 2009 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Sunray Wind I plant?
EIA lists no joint owners for Sunray Wind I. Diamond Shamrock Refining Company LP operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Sunray Wind I plant?
Sunray Wind I is in Sunray, Moore County, Texas, at 35.9454° N, 101.9005° W. It sits in the Southwest Power Pool balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Texas are similar in size?
Texas has 228 operable wind plants with 43,942 MW of capacity, and Sunray Wind I's 49.5 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Silver Star I Wind Power Project | Erath | 53 | 204,866 |
| Cotton Plains Wind Farm | Floyd | 50 | 181,894 |
| Hidalgo Wind Farm II | Hidalgo | 50 | 152,788 |
| Sunray Wind I | Moore | 50 | 131,397 |
| Sweetwater Wind 1 LLC | Nolan | 38 | 138,212 |
| Big Spring Wind Power Facility | Howard | 34 | 56,793 |
| Seymour Hills Wind Project, LLC | Baylor | 30 | 119,294 |
Source: EIA Forms EIA-860 and EIA-923, 2025.