Sunray Wind I power plant, Texas

Sunray Wind I is a 49.5 MW wind power plant in Moore County, Texas, operated by Diamond Shamrock Refining Company LP, and it generated 131,397 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 40th percentile of U.S. wind plants. By 2025 generation it ranks 3,092nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

49.5 MWNameplate capacity
30%Capacity factor, 2025, 40th percentile, on 49.5 MW net summer
3,092ndU.S. rank by generation, 2025
16 yearsAverage generator age, by MW

How hard does the Sunray Wind I plant run compared with other wind plants?

The Sunray Wind I plant had a capacity factor of 30% in 2025 on 49.5 MW of net summer capacity, the 40th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 111 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Sunray Wind I30%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Sunray Wind I plant generating more or less than last year?

Generation at Sunray Wind I rose 1.3% from 2024 to 2025, from 129,718 MWh to 131,397 MWh.

Net generation by period
PeriodMWh
2024129,718
2025131,397
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202513,067
November 202511,419
October 202511,790
September 20256,886
August 20253,188
July 20259,462
June 20259,906
May 202510,368
April 202514,696
March 202515,730
February 202512,058
January 202512,827
December 202413,185
November 202413,335
October 202412,545
September 20249,524
August 20247,877
July 202411,092
June 202411,395
May 202412,682
April 202413,958
March 202411,791
February 20249,421
January 20242,913

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Sunray Wind I plant?

Sunray Wind I made 0.0% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.0% of the state's 195,966 MW of capacity. By capacity it is the 609th largest of 1,023 plants in Texas, the 3,859th largest of 14,327 in the U.S. and the 891st largest of 1,358 wind plants. By 2025 generation it is the 477th largest of 816 generating plants in the state.

Sunray Wind I within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)50195,9660.0%
Generation (MWh)131,397592,896,1760.0%
Wind capacity (MW)5043,9420.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Sunray Wind I plant, and when do they retire?

1 operable generator totals 49.5 MW, with an average age of 16 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s150100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
WND1OperatingOnshore Wind Turbine502009n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Sunray Wind I plant?

EIA lists no joint owners for Sunray Wind I. Diamond Shamrock Refining Company LP operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Sunray Wind I plant?

Sunray Wind I is in Sunray, Moore County, Texas, at 35.9454° N, 101.9005° W. It sits in the Southwest Power Pool balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Texas are similar in size?

Texas has 228 operable wind plants with 43,942 MW of capacity, and Sunray Wind I's 49.5 MW is 0% of that.

Wind plants in Texas around this size
PlantCountyMW2025 MWh
Silver Star I Wind Power ProjectErath53204,866
Cotton Plains Wind FarmFloyd50181,894
Hidalgo Wind Farm IIHidalgo50152,788
Sunray Wind IMoore50131,397
Sweetwater Wind 1 LLCNolan38138,212
Big Spring Wind Power FacilityHoward3456,793
Seymour Hills Wind Project, LLCBaylor30119,294

Source: EIA Forms EIA-860 and EIA-923, 2025.