Solar power plant, Texas
SolaireHolman Solar Project, Texas
SolaireHolman Solar Project is a 50 MW solar power plant in Brewster County, Texas, operated by SolaireHolman 1, LLC, and it generated 105,987 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 59th percentile of U.S. solar plants. By 2025 generation it ranks 3,329th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the SolaireHolman Solar Project plant run compared with other solar plants?
The SolaireHolman Solar Project plant had a capacity factor of 24% in 2025 on 50 MW of net summer capacity, the 59th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 88 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| SolaireHolman Solar Project | 24% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the SolaireHolman Solar Project plant generating more or less than last year?
Generation at SolaireHolman Solar Project fell 10.2% from 2024 to 2025, from 117,983 MWh to 105,987 MWh. Through August 2026 it is running 38.5% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 117,983 |
| 2025 | 105,987 |
| 2026 through August | 46,406 |
| 2025, same months | 75,443 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 4,361 |
| July 2026 | 4,799 |
| June 2026 | 4,953 |
| May 2026 | 5,761 |
| April 2026 | 4,601 |
| March 2026 | 7,561 |
| February 2026 | 7,922 |
| January 2026 | 6,448 |
| December 2025 | 6,285 |
| November 2025 | 7,144 |
| October 2025 | 9,022 |
| September 2025 | 8,093 |
| August 2025 | 9,638 |
| July 2025 | 8,701 |
| June 2025 | 7,504 |
| May 2025 | 10,245 |
| April 2025 | 11,027 |
| March 2025 | 10,608 |
| February 2025 | 9,349 |
| January 2025 | 8,371 |
| December 2024 | 7,053 |
| November 2024 | 7,956 |
| October 2024 | 10,275 |
| September 2024 | 9,633 |
| August 2024 | 12,391 |
| July 2024 | 10,333 |
| June 2024 | 10,648 |
| May 2024 | 12,754 |
| April 2024 | 11,557 |
| March 2024 | 10,045 |
| February 2024 | 7,865 |
| January 2024 | 7,473 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the SolaireHolman Solar Project plant, and when do they retire?
1 operable generator totals 50 MW, with an average age of 8 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 50 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| PV1 | Operating | Solar Photovoltaic | 50 | 2017 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the SolaireHolman Solar Project plant?
EIA lists no joint owners for SolaireHolman Solar Project. SolaireHolman 1, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the SolaireHolman Solar Project plant?
SolaireHolman Solar Project is in Alpine, Brewster County, Texas, at 30.4551° N, 103.4747° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and SolaireHolman Solar Project's 50 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Kellam Solar | Van Zandt | 59 | 110,615 |
| Brightside | Bee | 51 | 93,985 |
| Pearl Solar | Pecos | 50 | 97,375 |
| SolaireHolman Solar Project | Brewster | 50 | 105,987 |
| Lamesa II | Dawson | 50 | 120,697 |
| BT Signal Ranch | Hunt | 50 | 99,664 |
| Gransolar Texas One, LLC | Milam | 50 | 110,595 |
Source: EIA Forms EIA-860 and EIA-923, 2025.