Solar power plant, Texas
Gransolar Texas One, LLC solar power plant, Texas
Gransolar Texas One, LLC is a 50 MW solar power plant in Milam County, Texas, operated by Gransolar Texas One, LLC, and it generated 110,595 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 66th percentile of U.S. solar plants. By 2025 generation it ranks 3,285th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Gransolar Texas One, LLC plant run compared with other solar plants?
The Gransolar Texas One, LLC plant had a capacity factor of 25% in 2025 on 50 MW of net summer capacity, the 66th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 92 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Gransolar Texas One, LLC | 25% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Gransolar Texas One, LLC plant generating more or less than last year?
Gransolar Texas One, LLC generated 110,595 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 6.9% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 110,595 |
| 2026 through August | 79,453 |
| 2025, same months | 74,319 |
Monthly generation, Feb 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 14,062 |
| July 2026 | 13,747 |
| June 2026 | 12,223 |
| May 2026 | 10,800 |
| April 2026 | 7,827 |
| March 2026 | 10,439 |
| February 2026 | 5,072 |
| January 2026 | 5,283 |
| December 2025 | 5,789 |
| November 2025 | 7,218 |
| October 2025 | 11,159 |
| September 2025 | 12,110 |
| August 2025 | 12,614 |
| July 2025 | 11,870 |
| June 2025 | 13,257 |
| May 2025 | 12,562 |
| April 2025 | 10,487 |
| March 2025 | 7,873 |
| February 2025 | 5,656 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Gransolar Texas One, LLC plant, and when do they retire?
1 operable generator totals 50 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 50 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GRTX1 | Operating | Solar Photovoltaic | 50 | 2025 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Gransolar Texas One, LLC plant?
EIA lists no joint owners for Gransolar Texas One, LLC. Gransolar Texas One, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Gransolar Texas One, LLC plant?
Gransolar Texas One, LLC is in Thorndale, Milam County, Texas, at 30.5998° N, 97.1548° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Gransolar Texas One, LLC's 50 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| SolaireHolman Solar Project | Brewster | 50 | 105,987 |
| Lamesa II | Dawson | 50 | 120,697 |
| BT Signal Ranch | Hunt | 50 | 99,664 |
| Gransolar Texas One, LLC | Milam | 50 | 110,595 |
| Pitts Dudik Solar | Hill | 50 | 101,679 |
| Vancourt Solar Interconnections | Cameron | 45 | 93,940 |
| OCI Alamo Solar I Hybrid | Bexar | 41 | 77,823 |
Source: EIA Forms EIA-860 and EIA-923, 2025.