Pitts Dudik Solar power plant, Texas
Pitts Dudik Solar is a 49.6 MW solar power plant in Hill County, Texas, operated by Elawan Pitts Dudik Solar, LLC, and it generated 101,679 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 52nd percentile of U.S. solar plants. By 2025 generation it ranks 3,373rd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Pitts Dudik Solar plant run compared with other solar plants?
The Pitts Dudik Solar plant had a capacity factor of 23% in 2025 on 49.6 MW of net summer capacity, the 52nd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 85 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Pitts Dudik Solar | 23% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Pitts Dudik Solar plant generating more or less than last year?
Generation at Pitts Dudik Solar fell 4.6% from 2024 to 2025, from 106,537 MWh to 101,679 MWh. Through August 2026 it is running 0.2% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 106,537 |
| 2025 | 101,679 |
| 2026 through August | 74,395 |
| 2025, same months | 74,210 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 12,846 |
| July 2026 | 12,488 |
| June 2026 | 10,759 |
| May 2026 | 9,551 |
| April 2026 | 6,902 |
| March 2026 | 9,466 |
| February 2026 | 6,362 |
| January 2026 | 6,021 |
| December 2025 | 1,798 |
| November 2025 | 6,391 |
| October 2025 | 9,160 |
| September 2025 | 10,120 |
| August 2025 | 11,502 |
| July 2025 | 10,539 |
| June 2025 | 11,250 |
| May 2025 | 10,199 |
| April 2025 | 8,652 |
| March 2025 | 9,974 |
| February 2025 | 6,124 |
| January 2025 | 5,970 |
| December 2024 | 5,312 |
| November 2024 | 6,505 |
| October 2024 | 9,807 |
| September 2024 | 9,689 |
| August 2024 | 12,389 |
| July 2024 | 12,265 |
| June 2024 | 12,102 |
| May 2024 | 8,461 |
| April 2024 | 8,514 |
| March 2024 | 8,710 |
| February 2024 | 7,075 |
| January 2024 | 5,708 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Pitts Dudik Solar plant, and when do they retire?
1 operable generator totals 49.6 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 50 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| PTSDK | Operating | Solar Photovoltaic | 50 | 2023 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Pitts Dudik Solar plant?
EIA lists no joint owners for Pitts Dudik Solar. Elawan Pitts Dudik Solar, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Pitts Dudik Solar plant?
Pitts Dudik Solar is in Hubbard, Hill County, Texas, at 31.8932° N, 96.8751° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Pitts Dudik Solar's 49.6 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Lamesa II | Dawson | 50 | 120,697 |
| BT Signal Ranch | Hunt | 50 | 99,664 |
| Gransolar Texas One, LLC | Milam | 50 | 110,595 |
| Pitts Dudik Solar | Hill | 50 | 101,679 |
| Vancourt Solar Interconnections | Cameron | 45 | 93,940 |
| OCI Alamo Solar I Hybrid | Bexar | 41 | 77,823 |
| BT Jungmann | Milam | 40 | 85,280 |
Source: EIA Forms EIA-860 and EIA-923, 2025.