Solar power plant, Texas

BT Jungmann solar power plant, Texas

BT Jungmann is a 40 MW solar power plant in Milam County, Texas, operated by BT Jungmann, LLC, and it generated 85,280 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 59th percentile of U.S. solar plants. By 2025 generation it ranks 3,579th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

40 MWNameplate capacity
24%Capacity factor, 2025, 59th percentile, on 40 MW net summer
3,579thU.S. rank by generation, 2025
Under 1 yearAverage generator age, by MW

How hard does the BT Jungmann plant run compared with other solar plants?

The BT Jungmann plant had a capacity factor of 24% in 2025 on 40 MW of net summer capacity, the 59th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 89 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
BT Jungmann24%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the BT Jungmann plant generating more or less than last year?

BT Jungmann generated 85,280 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 4.6% behind the same months of 2025.

Net generation by period
PeriodMWh
2024n/a
202585,280
2026 through August56,857
2025, same months59,578
Monthly generation, Feb 2025 to Aug 2026
MonthMWh
August 202610,121
July 202610,351
June 20268,827
May 20267,376
April 20265,683
March 20267,022
February 20263,534
January 20263,943
December 20254,551
November 20255,767
October 20256,887
September 20258,497
August 20259,525
July 20259,191
June 202510,039
May 20258,708
April 20258,208
March 20258,548
February 20255,359

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the BT Jungmann plant?

BT Jungmann made 0.0% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.0% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 617th largest of 1,023 plants in Texas, the 4,074th largest of 14,327 in the U.S. and the 976th largest of 7,223 solar plants. By 2025 generation it is the 504th largest of 816 generating plants in the state.

BT Jungmann within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)40195,9660.0%
Generation (MWh)85,280592,896,1760.0%
Solar capacity (MW)4030,7390.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the BT Jungmann plant, and when do they retire?

1 operable generator totals 40 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s140100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
JUNGMOperatingSolar Photovoltaic402025n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the BT Jungmann plant?

EIA lists no joint owners for BT Jungmann. BT Jungmann, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the BT Jungmann plant?

BT Jungmann is in Buckholts, Milam County, Texas, at 30.9038° N, 97.0578° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Texas are similar in size?

Texas has 225 operable solar plants with 30,739 MW of capacity, and BT Jungmann's 40 MW is 0% of that.

Solar plants in Texas around this size
PlantCountyMW2025 MWh
Pitts Dudik SolarHill50101,679
Vancourt Solar InterconnectionsCameron4593,940
OCI Alamo Solar I HybridBexar4177,823
BT JungmannMilam4085,280
OCI Alamo 4, LLCKinney4070,469
Barilla SolarPecos3052,945
Webberville Solar ProjectTravis3056,362

Source: EIA Forms EIA-860 and EIA-923, 2025.