Solar power plant, Texas
Barilla Solar power plant, Texas
Barilla Solar is a 30.2 MW solar power plant in Pecos County, Texas, operated by Leeward Asset Management, LLC, and it generated 52,945 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 26th percentile of U.S. solar plants. By 2025 generation it ranks 4,028th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Barilla Solar plant run compared with other solar plants?
The Barilla Solar plant had a capacity factor of 20% in 2025 on 30.2 MW of net summer capacity, the 26th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 73 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Barilla Solar | 20% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Barilla Solar plant generating more or less than last year?
Generation at Barilla Solar fell 1.4% from 2024 to 2025, from 53,677 MWh to 52,945 MWh.
| Period | MWh |
|---|---|
| 2024 | 53,677 |
| 2025 | 52,945 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 2,971 |
| November 2025 | 3,484 |
| October 2025 | 3,959 |
| September 2025 | 4,219 |
| August 2025 | 4,616 |
| July 2025 | 4,695 |
| June 2025 | 4,298 |
| May 2025 | 5,542 |
| April 2025 | 5,196 |
| March 2025 | 5,085 |
| February 2025 | 4,615 |
| January 2025 | 4,265 |
| December 2024 | 4,022 |
| November 2024 | 4,145 |
| October 2024 | 5,108 |
| September 2024 | 4,268 |
| August 2024 | 5,315 |
| July 2024 | 4,336 |
| June 2024 | 4,272 |
| May 2024 | 5,573 |
| April 2024 | 4,930 |
| March 2024 | 4,833 |
| February 2024 | 2,795 |
| January 2024 | 4,080 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Barilla Solar plant, and when do they retire?
1 operable generator totals 30.2 MW, with an average age of 10 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 30 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| BRLA | Operating | Solar Photovoltaic | 30 | 2015 | n/a |
| BARBA | Postponed indefinitely | Batteries | 20 | n/a | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Barilla Solar plant?
EIA lists no joint owners for Barilla Solar. Leeward Asset Management, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Barilla Solar plant?
Barilla Solar is in Fort Stockton, Pecos County, Texas, at 30.9600° N, 103.3500° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Barilla Solar's 30.2 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| OCI Alamo Solar I Hybrid | Bexar | 41 | 77,823 |
| BT Jungmann | Milam | 40 | 85,280 |
| OCI Alamo 4, LLC | Kinney | 40 | 70,469 |
| Barilla Solar | Pecos | 30 | 52,945 |
| Webberville Solar Project | Travis | 30 | 56,362 |
| Bluebell Solar | Sterling | 30 | 71,759 |
| Oberon IB | Ector | 30 | 61,946 |
Source: EIA Forms EIA-860 and EIA-923, 2025.