Skip to main content
RateWatt

Solar power plant, Texas

Barilla Solar power plant, Texas

Barilla Solar is a 30.2 MW solar power plant in Pecos County, Texas, operated by Leeward Asset Management, LLC, and it generated 52,945 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 26th percentile of U.S. solar plants. By 2025 generation it ranks 4,028th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

30.2 MWNameplate capacity
20%Capacity factor, 2025, 26th percentile, on 30.2 MW net summer
4,028thU.S. rank by generation, 2025
10 yearsAverage generator age, by MW

How hard does the Barilla Solar plant run compared with other solar plants?

The Barilla Solar plant had a capacity factor of 20% in 2025 on 30.2 MW of net summer capacity, the 26th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 73 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Barilla Solar20%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Barilla Solar plant generating more or less than last year?

Generation at Barilla Solar fell 1.4% from 2024 to 2025, from 53,677 MWh to 52,945 MWh.

Net generation by period
PeriodMWh
202453,677
202552,945
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20252,971
November 20253,484
October 20253,959
September 20254,219
August 20254,616
July 20254,695
June 20254,298
May 20255,542
April 20255,196
March 20255,085
February 20254,615
January 20254,265
December 20244,022
November 20244,145
October 20245,108
September 20244,268
August 20245,315
July 20244,336
June 20244,272
May 20245,573
April 20244,930
March 20244,833
February 20242,795
January 20244,080

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Barilla Solar plant?

Barilla Solar made 0.0% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.0% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 627th largest of 1,023 plants in Texas, the 4,348th largest of 14,327 in the U.S. and the 1,010th largest of 7,223 solar plants. By 2025 generation it is the 532nd largest of 816 generating plants in the state.

Barilla Solar within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)30195,9660.0%
Generation (MWh)52,945592,896,1760.0%
Solar capacity (MW)3030,7390.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Barilla Solar plant, and when do they retire?

1 operable generator totals 30.2 MW, with an average age of 10 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s130100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
BRLAOperatingSolar Photovoltaic302015n/a
BARBAPostponed indefinitelyBatteries20n/an/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Barilla Solar plant?

EIA lists no joint owners for Barilla Solar. Leeward Asset Management, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Barilla Solar plant?

Barilla Solar is in Fort Stockton, Pecos County, Texas, at 30.9600° N, 103.3500° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Texas are similar in size?

Texas has 225 operable solar plants with 30,739 MW of capacity, and Barilla Solar's 30.2 MW is 0% of that.

Solar plants in Texas around this size
PlantCountyMW2025 MWh
OCI Alamo Solar I HybridBexar4177,823
BT JungmannMilam4085,280
OCI Alamo 4, LLCKinney4070,469
Barilla SolarPecos3052,945
Webberville Solar ProjectTravis3056,362
Bluebell SolarSterling3071,759
Oberon IBEctor3061,946

Source: EIA Forms EIA-860 and EIA-923, 2025.