Solar power plant, Texas
OCI Alamo Solar I Hybrid power plant, Texas
OCI Alamo Solar I Hybrid is a 40.7 MW solar power plant in Bexar County, Texas, operated by OCI Energy LLC, and it generated 77,823 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 40th percentile of U.S. solar plants. By 2025 generation it ranks 3,670th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the OCI Alamo Solar I Hybrid plant run compared with other solar plants?
The OCI Alamo Solar I Hybrid plant had a capacity factor of 22% in 2025 on 40.7 MW of net summer capacity, the 40th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 80 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| OCI Alamo Solar I Hybrid | 22% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the OCI Alamo Solar I Hybrid plant generating more or less than last year?
Generation at OCI Alamo Solar I Hybrid fell 7.3% from 2024 to 2025, from 83,963 MWh to 77,823 MWh.
| Period | MWh |
|---|---|
| 2024 | 83,963 |
| 2025 | 77,823 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 4,490 |
| November 2025 | 5,179 |
| October 2025 | 7,642 |
| September 2025 | 7,809 |
| August 2025 | 8,216 |
| July 2025 | 7,191 |
| June 2025 | 7,575 |
| May 2025 | 7,279 |
| April 2025 | 6,597 |
| March 2025 | 7,109 |
| February 2025 | 4,301 |
| January 2025 | 4,435 |
| December 2024 | 3,845 |
| November 2024 | 5,645 |
| October 2024 | 7,614 |
| September 2024 | 8,206 |
| August 2024 | 9,450 |
| July 2024 | 8,349 |
| June 2024 | 9,095 |
| May 2024 | 6,810 |
| April 2024 | 6,928 |
| March 2024 | 6,479 |
| February 2024 | 6,347 |
| January 2024 | 5,195 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the OCI Alamo Solar I Hybrid plant, and when do they retire?
1 operable generator totals 40.7 MW, with an average age of 12 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 1 has already retired, totalling 1 MW.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 41 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Solar Photovoltaic | 41 | 2013 | n/a |
| ASTRO | Retired | Batteries | 1 | 2016 | 2022 |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the OCI Alamo Solar I Hybrid plant?
EIA lists no joint owners for OCI Alamo Solar I Hybrid. OCI Energy LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the OCI Alamo Solar I Hybrid plant?
OCI Alamo Solar I Hybrid is in San Antonio, Bexar County, Texas, at 29.2717° N, 98.4447° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and OCI Alamo Solar I Hybrid's 40.7 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Gransolar Texas One, LLC | Milam | 50 | 110,595 |
| Pitts Dudik Solar | Hill | 50 | 101,679 |
| Vancourt Solar Interconnections | Cameron | 45 | 93,940 |
| OCI Alamo Solar I Hybrid | Bexar | 41 | 77,823 |
| BT Jungmann | Milam | 40 | 85,280 |
| OCI Alamo 4, LLC | Kinney | 40 | 70,469 |
| Barilla Solar | Pecos | 30 | 52,945 |
Source: EIA Forms EIA-860 and EIA-923, 2025.