Solar power plant, Alabama
TAI Huntsville Solar Hybrid power plant, Alabama
TAI Huntsville Solar Hybrid is a 32.4 MW solar power plant in Madison County, Alabama, operated by TAI Huntsville Solar, LLC, and it generated 62,449 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 40th percentile of U.S. solar plants. By 2025 generation it ranks 3,843rd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the TAI Huntsville Solar Hybrid plant run compared with other solar plants?
The TAI Huntsville Solar Hybrid plant had a capacity factor of 22% in 2025 on 32.4 MW of net summer capacity, the 40th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 80 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| TAI Huntsville Solar Hybrid | 22% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the TAI Huntsville Solar Hybrid plant generating more or less than last year?
TAI Huntsville Solar Hybrid generated 62,449 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 7.0% ahead of the same months of 2025. 2024 has output for only 6 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 30,595 |
| 2025 | 62,449 |
| 2026 through August | 47,818 |
| 2025, same months | 44,694 |
Monthly generation, Jul 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 7,183 |
| July 2026 | 6,418 |
| June 2026 | 6,741 |
| May 2026 | 6,581 |
| April 2026 | 7,579 |
| March 2026 | 5,631 |
| February 2026 | 4,315 |
| January 2026 | 3,370 |
| December 2025 | 2,723 |
| November 2025 | 3,767 |
| October 2025 | 5,183 |
| September 2025 | 6,082 |
| August 2025 | 6,566 |
| July 2025 | 5,774 |
| June 2025 | 6,352 |
| May 2025 | 5,974 |
| April 2025 | 6,305 |
| March 2025 | 6,242 |
| February 2025 | 3,717 |
| January 2025 | 3,764 |
| December 2024 | 2,902 |
| November 2024 | 3,184 |
| October 2024 | 6,061 |
| September 2024 | 5,124 |
| August 2024 | 7,138 |
| July 2024 | 6,186 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the TAI Huntsville Solar Hybrid plant, and when do they retire?
1 operable generator totals 32.4 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 32 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| PV1 | Operating | Solar Photovoltaic | 32 | 2024 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the TAI Huntsville Solar Hybrid plant?
EIA lists no joint owners for TAI Huntsville Solar Hybrid. TAI Huntsville Solar, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the TAI Huntsville Solar Hybrid plant?
TAI Huntsville Solar Hybrid is in Huntsville, Madison County, Alabama, at 34.8296° N, 86.6304° W. It sits in the Tennessee Valley Authority balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Alabama are similar in size?
Alabama has 12 operable solar plants with 746 MW of capacity, and TAI Huntsville Solar Hybrid's 32.4 MW is 4% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| TAI Huntsville Solar Hybrid | Madison | 32 | 62,449 |
| Fort Benning Solar Facility | Russell | 30 | 56,032 |
Source: EIA Forms EIA-860 and EIA-923, 2025.