Solar power plant, California
Topaz Solar Farm, California
Topaz Solar Farm is a 586 MW solar power plant in San Luis Obispo County, California, operated by Topaz Solar Farms LLC, and it generated 1,018,564 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.5% of the generation reported in California, and its capacity factor sits at the 25th percentile of U.S. solar plants. By 2025 generation it ranks 725th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Topaz Solar Farm plant run compared with other solar plants?
The Topaz Solar Farm plant had a capacity factor of 20% in 2025 on 586 MW of net summer capacity, the 25th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 72 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Topaz Solar Farm | 20% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Topaz Solar Farm plant generating more or less than last year?
Generation at Topaz Solar Farm fell 4.9% from 2024 to 2025, from 1,071,076 MWh to 1,018,564 MWh. Through August 2026 it is running 5.3% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 1,071,076 |
| 2025 | 1,018,564 |
| 2026 through August | 647,496 |
| 2025, same months | 683,611 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 123,781 |
| July 2026 | 132,905 |
| June 2026 | 106,118 |
| May 2026 | 48,895 |
| April 2026 | 32,001 |
| March 2026 | 58,963 |
| February 2026 | 61,168 |
| January 2026 | 83,665 |
| December 2025 | 73,996 |
| November 2025 | 73,838 |
| October 2025 | 83,607 |
| September 2025 | 103,512 |
| August 2025 | 115,632 |
| July 2025 | 127,760 |
| June 2025 | 104,328 |
| May 2025 | 104,354 |
| April 2025 | 60,068 |
| March 2025 | 45,823 |
| February 2025 | 41,228 |
| January 2025 | 84,418 |
| December 2024 | 72,947 |
| November 2024 | 59,396 |
| October 2024 | 81,558 |
| September 2024 | 110,236 |
| August 2024 | 123,491 |
| July 2024 | 116,425 |
| June 2024 | 107,528 |
| May 2024 | 100,010 |
| April 2024 | 81,331 |
| March 2024 | 79,489 |
| February 2024 | 71,784 |
| January 2024 | 66,881 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Topaz Solar Farm plant, and when do they retire?
5 operable generators total 586 MW, with an average age of 11 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 5 | 586 | 100% | none reported |
Every generator, 5 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| TPZ1 | Operating | Solar Photovoltaic | 130 | 2013 | n/a |
| TPZ2 | Operating | Solar Photovoltaic | 151 | 2013 | n/a |
| TPZ3 | Operating | Solar Photovoltaic | 102 | 2014 | n/a |
| TPZ4 | Operating | Solar Photovoltaic | 90 | 2014 | n/a |
| TPZ5 | Operating | Solar Photovoltaic | 113 | 2014 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Topaz Solar Farm plant?
EIA lists no joint owners for Topaz Solar Farm. Topaz Solar Farms LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Topaz Solar Farm plant?
Topaz Solar Farm is in Santa Margarita, San Luis Obispo County, California, at 35.4056° N, 120.0686° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Topaz Solar Farm's 586 MW is 2% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Topaz Solar Farm | San Luis Obispo | 586 | 1,018,564 |
| Bellefield Solar and Energy Storage Farm | Kern | 500 | 57,898 |
| Solar Star 1 | Kern | 318 | 897,067 |
| Desert Sunlight 300, LLC | Riverside | 314 | 620,193 |
Source: EIA Forms EIA-860 and EIA-923, 2025.