Solar power plant, California
Bellefield Solar and Energy Storage Farm, California
Bellefield Solar and Energy Storage Farm is a 1,000 MW power plant, 500 MW of it solar, in Kern County, California, operated by 50LW 8me LLC, and it generated 57,898 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 2nd percentile of U.S. solar plants. By 2025 generation it ranks 3,909th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Bellefield Solar and Energy Storage Farm plant run compared with other solar plants?
The Bellefield Solar and Energy Storage Farm plant's solar units had a capacity factor of 1% in 2025 on 500 MW of net summer capacity, the 2nd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 5 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Bellefield Solar and Energy Storage Farm | 1% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.
Is the Bellefield Solar and Energy Storage Farm plant generating more or less than last year?
Bellefield Solar and Energy Storage Farm generated 57,898 MWh in 2025; EIA reports no 2024 total to compare.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 57,898 |
| 2026 through August | 782,277 |
Monthly generation, Dec 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 143,134 |
| July 2026 | 130,420 |
| June 2026 | 126,910 |
| May 2026 | 49,322 |
| April 2026 | 61,604 |
| March 2026 | 127,033 |
| February 2026 | 78,325 |
| January 2026 | 65,529 |
| December 2025 | 57,898 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Bellefield Solar and Energy Storage Farm plant, and when do they retire?
2 operable generators total 1,000 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 2 | 1,000 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 50LWA | Operating | Solar Photovoltaic | 500 | 2025 | n/a |
| 50LWB | Operating | Batteries | 500 | 2025 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Bellefield Solar and Energy Storage Farm plant?
EIA lists no joint owners for Bellefield Solar and Energy Storage Farm. 50LW 8me LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Bellefield Solar and Energy Storage Farm plant use?
Bellefield Solar and Energy Storage Farm has capacity on 2 fuels: 50% solar and 50% battery and pumped storage. In 2025, solar made 100% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Solar | 500 | 50.0% | 57,898 |
| Battery and pumped storage | 500 | 50.0% | 0 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Bellefield Solar and Energy Storage Farm plant?
Bellefield Solar and Energy Storage Farm is in Mojave, Kern County, California, at 35.0630° N, 118.0878° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Bellefield Solar and Energy Storage Farm's 500 MW is 2% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Topaz Solar Farm | San Luis Obispo | 586 | 1,018,564 |
| Bellefield Solar and Energy Storage Farm | Kern | 500 | 57,898 |
| Solar Star 1 | Kern | 318 | 897,067 |
| Desert Sunlight 300, LLC | Riverside | 314 | 620,193 |
| Eland Solar & Storage Center, Phase 1 Hy | Kern | 310 | 706,222 |
Source: EIA Forms EIA-860 and EIA-923, 2025.