Solar power plant, California
Solar Star 1 power plant, California
Solar Star 1 is a 318 MW solar power plant in Kern County, California, operated by Solar Star California XIX, LLC, and it generated 897,067 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in California, and its capacity factor sits at the 98th percentile of U.S. solar plants. By 2025 generation it ranks 795th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Solar Star 1 plant run compared with other solar plants?
The Solar Star 1 plant had a capacity factor of 33% in 2025 on 310 MW of net summer capacity, the 98th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 121 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Solar Star 1 | 33% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Solar Star 1 plant generating more or less than last year?
Generation at Solar Star 1 rose 2.6% from 2024 to 2025, from 874,743 MWh to 897,067 MWh. Through August 2026 it is running 2.7% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 874,743 |
| 2025 | 897,067 |
| 2026 through August | 649,799 |
| 2025, same months | 667,776 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 92,066 |
| July 2026 | 96,900 |
| June 2026 | 104,698 |
| May 2026 | 97,625 |
| April 2026 | 84,256 |
| March 2026 | 79,089 |
| February 2026 | 50,999 |
| January 2026 | 44,166 |
| December 2025 | 41,328 |
| November 2025 | 41,103 |
| October 2025 | 70,094 |
| September 2025 | 76,766 |
| August 2025 | 92,832 |
| July 2025 | 105,954 |
| June 2025 | 102,393 |
| May 2025 | 98,960 |
| April 2025 | 89,767 |
| March 2025 | 73,801 |
| February 2025 | 53,901 |
| January 2025 | 50,168 |
| December 2024 | 41,167 |
| November 2024 | 46,633 |
| October 2024 | 65,403 |
| September 2024 | 78,074 |
| August 2024 | 94,587 |
| July 2024 | 97,530 |
| June 2024 | 99,611 |
| May 2024 | 101,166 |
| April 2024 | 86,525 |
| March 2024 | 71,376 |
| February 2024 | 48,338 |
| January 2024 | 44,333 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Solar Star 1 plant, and when do they retire?
7 operable generators total 318 MW, with an average age of 11 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 7 | 318 | 100% | none reported |
Every generator, 7 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| AVS1 | Operating | Solar Photovoltaic | 39 | 2014 | n/a |
| SS13 | Operating | Solar Photovoltaic | 59 | 2014 | n/a |
| SS15 | Operating | Solar Photovoltaic | 15 | 2014 | n/a |
| SS16 | Operating | Solar Photovoltaic | 65 | 2014 | n/a |
| SS11 | Operating | Solar Photovoltaic | 54 | 2015 | n/a |
| SS12 | Operating | Solar Photovoltaic | 54 | 2015 | n/a |
| SS14 | Operating | Solar Photovoltaic | 33 | 2015 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Solar Star 1 plant?
EIA lists no joint owners for Solar Star 1. Solar Star California XIX, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Solar Star 1 plant?
Solar Star 1 is in Rosamond, Kern County, California, at 34.8181° N, 118.4036° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Solar Star 1's 318 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Topaz Solar Farm | San Luis Obispo | 586 | 1,018,564 |
| Bellefield Solar and Energy Storage Farm | Kern | 500 | 57,898 |
| Solar Star 1 | Kern | 318 | 897,067 |
| Desert Sunlight 300, LLC | Riverside | 314 | 620,193 |
| Eland Solar & Storage Center, Phase 1 Hy | Kern | 310 | 706,222 |
| Eland Solar & Storage Center, Phase 2 Hy | Kern | 308 | 268,356 |
Source: EIA Forms EIA-860 and EIA-923, 2025.