Skip to main content
RateWatt

Solar power plant, California

Eland Solar & Storage Center, Phase 2 Hy power plant, California

Eland Solar & Storage Center, Phase 2 Hy is a 458 MW power plant, 308 MW of it solar, in Kern County, California, operated by 69SV 8me LLC, and it generated 260,128 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 12th percentile of U.S. solar plants. By 2025 generation it ranks 2,161st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

458 MWNameplate capacity
15%Capacity factor, 2025, solar units, 12th percentile, on 200 MW net summer
0.1%Of CA generation, 2025
Under 1 yearAverage generator age, by MW

How hard does the Eland Solar & Storage Center, Phase 2 Hy plant run compared with other solar plants?

The Eland Solar & Storage Center, Phase 2 Hy plant's solar units had a capacity factor of 15% in 2025 on 200 MW of net summer capacity, the 12th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 56 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Eland Solar & Storage Center, Phase 2 Hy15%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Eland Solar & Storage Center, Phase 2 Hy plant generating more or less than last year?

Eland Solar & Storage Center, Phase 2 Hy generated 260,128 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 534.5% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024n/a
2025260,128
2026 through August484,375
2025, same months76,344
Monthly generation, Jul 2025 to Aug 2026
MonthMWh
August 202672,187
July 202677,195
June 202682,207
May 202674,077
April 202653,613
March 202656,181
February 202634,201
January 202634,714
December 202536,009
November 202539,364
October 202563,559
September 202544,852
August 202573,719
July 20252,625

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Eland Solar & Storage Center, Phase 2 Hy plant?

Eland Solar & Storage Center, Phase 2 Hy made 0.1% of the 204,542,898 MWh reported by California plants in 2025, from 0.4% of the state's 107,433 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 45th largest of 1,877 plants in California, the 787th largest of 14,327 in the U.S. and the 37th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 206th largest of 1,608 generating plants in the state.

Eland Solar & Storage Center, Phase 2 Hy within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)458107,4330.4%
Generation (MWh)260,128204,542,8980.1%
Solar capacity (MW)30824,6631.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Eland Solar & Storage Center, Phase 2 Hy plant, and when do they retire?

2 operable generators total 458 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2458100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
69SV8OperatingSolar Photovoltaic3082025n/a
61169OperatingBatteries1502025n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Eland Solar & Storage Center, Phase 2 Hy plant?

Arevon Asset Management is the only joint owner reported for Eland Solar & Storage Center, Phase 2 Hy, with 100.0%. 69SV 8me LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Eland Solar & Storage Center, Phase 2 Hy plant use?

Eland Solar & Storage Center, Phase 2 Hy has capacity on 2 fuels: 67% solar and 33% battery and pumped storage. In 2025, solar made 103% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar30867.2%268,356
Battery and pumped storage15032.8%-8,228

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Eland Solar & Storage Center, Phase 2 Hy plant?

Eland Solar & Storage Center, Phase 2 Hy is in Mojave, Kern County, California, at 35.2167° N, 117.9770° W. It sits in the Los Angeles Department of Water and Power balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Eland Solar & Storage Center, Phase 2 Hy's 308 MW is 1% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Solar Star 1Kern318897,067
Desert Sunlight 300, LLCRiverside314620,193
Eland Solar & Storage Center, Phase 1 HyKern310706,222
Eland Solar & Storage Center, Phase 2 HyKern308268,356
Desert QuartziteRiverside300843,910
Slate HybridKings300753,467
Rexford Solar FarmTulare300690,556

Source: EIA Forms EIA-860 and EIA-923, 2025.