Solar power plant, California
Eland Solar & Storage Center, Phase 2 Hy power plant, California
Eland Solar & Storage Center, Phase 2 Hy is a 458 MW power plant, 308 MW of it solar, in Kern County, California, operated by 69SV 8me LLC, and it generated 260,128 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 12th percentile of U.S. solar plants. By 2025 generation it ranks 2,161st of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Eland Solar & Storage Center, Phase 2 Hy plant run compared with other solar plants?
The Eland Solar & Storage Center, Phase 2 Hy plant's solar units had a capacity factor of 15% in 2025 on 200 MW of net summer capacity, the 12th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 56 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Eland Solar & Storage Center, Phase 2 Hy | 15% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.
Is the Eland Solar & Storage Center, Phase 2 Hy plant generating more or less than last year?
Eland Solar & Storage Center, Phase 2 Hy generated 260,128 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 534.5% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 260,128 |
| 2026 through August | 484,375 |
| 2025, same months | 76,344 |
Monthly generation, Jul 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 72,187 |
| July 2026 | 77,195 |
| June 2026 | 82,207 |
| May 2026 | 74,077 |
| April 2026 | 53,613 |
| March 2026 | 56,181 |
| February 2026 | 34,201 |
| January 2026 | 34,714 |
| December 2025 | 36,009 |
| November 2025 | 39,364 |
| October 2025 | 63,559 |
| September 2025 | 44,852 |
| August 2025 | 73,719 |
| July 2025 | 2,625 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Eland Solar & Storage Center, Phase 2 Hy plant, and when do they retire?
2 operable generators total 458 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 2 | 458 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 69SV8 | Operating | Solar Photovoltaic | 308 | 2025 | n/a |
| 61169 | Operating | Batteries | 150 | 2025 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Eland Solar & Storage Center, Phase 2 Hy plant?
Arevon Asset Management is the only joint owner reported for Eland Solar & Storage Center, Phase 2 Hy, with 100.0%. 69SV 8me LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Eland Solar & Storage Center, Phase 2 Hy plant use?
Eland Solar & Storage Center, Phase 2 Hy has capacity on 2 fuels: 67% solar and 33% battery and pumped storage. In 2025, solar made 103% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Solar | 308 | 67.2% | 268,356 |
| Battery and pumped storage | 150 | 32.8% | -8,228 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Eland Solar & Storage Center, Phase 2 Hy plant?
Eland Solar & Storage Center, Phase 2 Hy is in Mojave, Kern County, California, at 35.2167° N, 117.9770° W. It sits in the Los Angeles Department of Water and Power balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Eland Solar & Storage Center, Phase 2 Hy's 308 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Solar Star 1 | Kern | 318 | 897,067 |
| Desert Sunlight 300, LLC | Riverside | 314 | 620,193 |
| Eland Solar & Storage Center, Phase 1 Hy | Kern | 310 | 706,222 |
| Eland Solar & Storage Center, Phase 2 Hy | Kern | 308 | 268,356 |
| Desert Quartzite | Riverside | 300 | 843,910 |
| Slate Hybrid | Kings | 300 | 753,467 |
| Rexford Solar Farm | Tulare | 300 | 690,556 |
Source: EIA Forms EIA-860 and EIA-923, 2025.