Solar power plant, California
Slate Hybrid solar power plant, California
Slate Hybrid is a 440 MW power plant, 300 MW of it solar, in Kings County, California, operated by MN8 Energy LLC, and it generated 727,184 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in California, and its capacity factor sits at the 85th percentile of U.S. solar plants. By 2025 generation it ranks 955th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Slate Hybrid plant run compared with other solar plants?
The Slate Hybrid plant's solar units had a capacity factor of 29% in 2025 on 300 MW of net summer capacity, the 85th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 105 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Slate Hybrid | 29% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.
Is the Slate Hybrid plant generating more or less than last year?
Generation at Slate Hybrid rose 11.1% from 2024 to 2025, from 654,735 MWh to 727,184 MWh. Through August 2026 it is running 7.5% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 654,735 |
| 2025 | 727,184 |
| 2026 through August | 516,409 |
| 2025, same months | 558,058 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 81,453 |
| July 2026 | 90,513 |
| June 2026 | 78,997 |
| May 2026 | 67,966 |
| April 2026 | 58,747 |
| March 2026 | 68,546 |
| February 2026 | 42,014 |
| January 2026 | 28,173 |
| December 2025 | 13,664 |
| November 2025 | 26,012 |
| October 2025 | 60,060 |
| September 2025 | 69,390 |
| August 2025 | 85,524 |
| July 2025 | 99,080 |
| June 2025 | 93,812 |
| May 2025 | 78,693 |
| April 2025 | 61,795 |
| March 2025 | 54,873 |
| February 2025 | 41,714 |
| January 2025 | 42,567 |
| December 2024 | 23,796 |
| November 2024 | 35,830 |
| October 2024 | 53,570 |
| September 2024 | 69,281 |
| August 2024 | 81,373 |
| July 2024 | 84,566 |
| June 2024 | 83,005 |
| May 2024 | 67,875 |
| April 2024 | 64,466 |
| March 2024 | 33,510 |
| February 2024 | 31,741 |
| January 2024 | 25,722 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Slate Hybrid plant, and when do they retire?
9 operable generators total 440 MW, with an average age of 3 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 9 | 440 | 100% | none reported |
Every generator, 9 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| SLATE | Operating | Solar Photovoltaic | 51 | 2021 | n/a |
| SL3EC | Operating | Solar Photovoltaic | 68 | 2022 | n/a |
| SLB3C | Operating | Batteries | 34 | 2022 | n/a |
| SLBES | Operating | Batteries | 50 | 2022 | n/a |
| SLBPW | Operating | Batteries | 10 | 2022 | n/a |
| SLBSV | Operating | Batteries | 47 | 2022 | n/a |
| SLPWR | Operating | Solar Photovoltaic | 26 | 2022 | n/a |
| SLSTN | Operating | Solar Photovoltaic | 63 | 2022 | n/a |
| SLSVC | Operating | Solar Photovoltaic | 93 | 2022 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Slate Hybrid plant?
RE Slate 1 LLC is the only joint owner reported for Slate Hybrid, with 100.0%. MN8 Energy LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Slate Hybrid plant use?
Slate Hybrid has capacity on 2 fuels: 68% solar and 32% battery and pumped storage. In 2025, solar made 104% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Solar | 300 | 68.1% | 753,467 |
| Battery and pumped storage | 140 | 31.9% | -26,283 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Slate Hybrid plant?
Slate Hybrid is in Stratford, Kings County, California, at 36.2270° N, 119.8948° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Slate Hybrid's 300 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Eland Solar & Storage Center, Phase 1 Hy | Kern | 310 | 706,222 |
| Eland Solar & Storage Center, Phase 2 Hy | Kern | 308 | 268,356 |
| Desert Quartzite | Riverside | 300 | 843,910 |
| Slate Hybrid | Kings | 300 | 753,467 |
| Rexford Solar Farm | Tulare | 300 | 690,556 |
| Daggett 3 | San Bernardino | 300 | 882,769 |
| Stateline Solar | San Bernardino | 300 | 640,092 |
Source: EIA Forms EIA-860 and EIA-923, 2025.