Skip to main content
RateWatt

Solar power plant, California

Desert Quartzite solar power plant, California

Desert Quartzite is a 450 MW power plant, 300 MW of it solar, in Riverside County, California, operated by Desert Quartzite LLC, and it generated 822,859 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in California, and its capacity factor sits at the 97th percentile of U.S. solar plants. By 2025 generation it ranks 856th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

450 MWNameplate capacity
32%Capacity factor, 2025, solar units, 97th percentile, on 300 MW net summer
0.4%Of CA generation, 2025
1 yearAverage generator age, by MW

How hard does the Desert Quartzite plant run compared with other solar plants?

The Desert Quartzite plant's solar units had a capacity factor of 32% in 2025 on 300 MW of net summer capacity, the 97th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 117 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Desert Quartzite32%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Desert Quartzite plant generating more or less than last year?

Desert Quartzite generated 822,859 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 3.2% ahead of the same months of 2025. 2024 has output for only 1 month, so the two years are not compared.

Net generation by period
PeriodMWh
202481,745
2025822,859
2026 through August624,299
2025, same months604,871
Monthly generation, Dec 2024 to Aug 2026
MonthMWh
August 202681,261
July 202690,309
June 202693,728
May 202699,789
April 202680,610
March 202677,676
February 202653,381
January 202647,545
December 202542,693
November 202541,638
October 202564,793
September 202568,864
August 202584,727
July 202597,082
June 202596,557
May 202592,897
April 202583,437
March 202556,767
February 202548,948
January 202544,456
December 202481,745

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Desert Quartzite plant?

Desert Quartzite made 0.4% of the 204,542,898 MWh reported by California plants in 2025, from 0.4% of the state's 107,433 MW of capacity. By capacity it is the 46th largest of 1,877 plants in California, the 793rd largest of 14,327 in the U.S. and the 40th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 39th largest of 1,608 generating plants in the state.

Desert Quartzite within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)450107,4330.4%
Generation (MWh)822,859204,542,8980.4%
Solar capacity (MW)30024,6631.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Desert Quartzite plant, and when do they retire?

2 operable generators total 450 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2450100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN01OperatingSolar Photovoltaic3002024n/a
GEN02OperatingBatteries1502024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Desert Quartzite plant?

EIA lists no joint owners for Desert Quartzite. Desert Quartzite LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Desert Quartzite plant use?

Desert Quartzite has capacity on 2 fuels: 67% solar and 33% battery and pumped storage. In 2025, solar made 103% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar30066.7%843,910
Battery and pumped storage15033.3%-21,051

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Desert Quartzite plant?

Desert Quartzite is in Blythe, Riverside County, California, at 33.5650° N, 114.7530° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Desert Quartzite's 300 MW is 1% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Desert Sunlight 300, LLCRiverside314620,193
Eland Solar & Storage Center, Phase 1 HyKern310706,222
Eland Solar & Storage Center, Phase 2 HyKern308268,356
Desert QuartziteRiverside300843,910
Slate HybridKings300753,467
Rexford Solar FarmTulare300690,556
Daggett 3San Bernardino300882,769

Source: EIA Forms EIA-860 and EIA-923, 2025.