Solar power plant, California

Rexford Solar Farm, California

Rexford Solar Farm is a 540 MW power plant, 300 MW of it solar, in Tulare County, California, operated by AES Clean Energy, and it generated 658,185 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in California, and its capacity factor sits at the 73rd percentile of U.S. solar plants. By 2025 generation it ranks 1,042nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

540 MWNameplate capacity
26%Capacity factor, 2025, solar units, 73rd percentile, on 300 MW net summer
0.3%Of CA generation, 2025
Under 1 yearAverage generator age, by MW

How hard does the Rexford Solar Farm plant run compared with other solar plants?

The Rexford Solar Farm plant's solar units had a capacity factor of 26% in 2025 on 300 MW of net summer capacity, the 73rd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 96 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Rexford Solar Farm26%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Rexford Solar Farm plant generating more or less than last year?

Rexford Solar Farm generated 658,185 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 10.9% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024n/a
2025658,185
2026 through August545,840
2025, same months492,241
Monthly generation, Feb 2025 to Aug 2026
MonthMWh
August 202681,222
July 202684,449
June 202698,266
May 202681,081
April 202665,422
March 202656,018
February 202642,688
January 202636,694
December 202514,190
November 202527,145
October 202558,022
September 202566,587
August 202573,061
July 202593,382
June 202593,554
May 202589,253
April 202566,686
March 202544,811
February 202531,494

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Rexford Solar Farm plant?

Rexford Solar Farm made 0.3% of the 204,542,898 MWh reported by California plants in 2025, from 0.5% of the state's 107,433 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 39th largest of 1,877 plants in California, the 689th largest of 14,327 in the U.S. and the 47th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 55th largest of 1,608 generating plants in the state.

Rexford Solar Farm within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)540107,4330.5%
Generation (MWh)658,185204,542,8980.3%
Solar capacity (MW)30024,6631.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Rexford Solar Farm plant, and when do they retire?

2 operable generators total 540 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2540100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
20SD8OperatingSolar Photovoltaic3002025n/a
20SDBOperatingBatteries2402025n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Rexford Solar Farm plant?

EIA lists no joint owners for Rexford Solar Farm. AES Clean Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Rexford Solar Farm plant use?

Rexford Solar Farm has capacity on 2 fuels: 56% solar and 44% battery and pumped storage. In 2025, solar made 105% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar30055.6%690,556
Battery and pumped storage24044.4%-32,371

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Rexford Solar Farm plant?

Rexford Solar Farm is in Ducor, Tulare County, California, at 35.8405° N, 119.0827° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Rexford Solar Farm's 300 MW is 1% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Eland Solar & Storage Center, Phase 2 HyKern308268,356
Desert QuartziteRiverside300843,910
Slate HybridKings300753,467
Rexford Solar FarmTulare300690,556
Daggett 3San Bernardino300882,769
Stateline SolarSan Bernardino300640,092
Mojave Solar ProjectSan Bernardino280590,420

Source: EIA Forms EIA-860 and EIA-923, 2025.