Solar power plant, California
Rexford Solar Farm, California
Rexford Solar Farm is a 540 MW power plant, 300 MW of it solar, in Tulare County, California, operated by AES Clean Energy, and it generated 658,185 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in California, and its capacity factor sits at the 73rd percentile of U.S. solar plants. By 2025 generation it ranks 1,042nd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Rexford Solar Farm plant run compared with other solar plants?
The Rexford Solar Farm plant's solar units had a capacity factor of 26% in 2025 on 300 MW of net summer capacity, the 73rd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 96 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Rexford Solar Farm | 26% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.
Is the Rexford Solar Farm plant generating more or less than last year?
Rexford Solar Farm generated 658,185 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 10.9% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 658,185 |
| 2026 through August | 545,840 |
| 2025, same months | 492,241 |
Monthly generation, Feb 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 81,222 |
| July 2026 | 84,449 |
| June 2026 | 98,266 |
| May 2026 | 81,081 |
| April 2026 | 65,422 |
| March 2026 | 56,018 |
| February 2026 | 42,688 |
| January 2026 | 36,694 |
| December 2025 | 14,190 |
| November 2025 | 27,145 |
| October 2025 | 58,022 |
| September 2025 | 66,587 |
| August 2025 | 73,061 |
| July 2025 | 93,382 |
| June 2025 | 93,554 |
| May 2025 | 89,253 |
| April 2025 | 66,686 |
| March 2025 | 44,811 |
| February 2025 | 31,494 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Rexford Solar Farm plant, and when do they retire?
2 operable generators total 540 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 2 | 540 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 20SD8 | Operating | Solar Photovoltaic | 300 | 2025 | n/a |
| 20SDB | Operating | Batteries | 240 | 2025 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Rexford Solar Farm plant?
EIA lists no joint owners for Rexford Solar Farm. AES Clean Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Rexford Solar Farm plant use?
Rexford Solar Farm has capacity on 2 fuels: 56% solar and 44% battery and pumped storage. In 2025, solar made 105% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Solar | 300 | 55.6% | 690,556 |
| Battery and pumped storage | 240 | 44.4% | -32,371 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Rexford Solar Farm plant?
Rexford Solar Farm is in Ducor, Tulare County, California, at 35.8405° N, 119.0827° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Rexford Solar Farm's 300 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Eland Solar & Storage Center, Phase 2 Hy | Kern | 308 | 268,356 |
| Desert Quartzite | Riverside | 300 | 843,910 |
| Slate Hybrid | Kings | 300 | 753,467 |
| Rexford Solar Farm | Tulare | 300 | 690,556 |
| Daggett 3 | San Bernardino | 300 | 882,769 |
| Stateline Solar | San Bernardino | 300 | 640,092 |
| Mojave Solar Project | San Bernardino | 280 | 590,420 |
Source: EIA Forms EIA-860 and EIA-923, 2025.