Solar power plant, California

Mojave Solar Project, California

Mojave Solar Project is a 280 MW solar power plant in San Bernardino County, California, operated by Mojave Solar LLC, and it generated 590,420 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in California, and its capacity factor sits at the 61st percentile of U.S. solar plants. By 2025 generation it ranks 1,143rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

280 MWNameplate capacity
25%Capacity factor, 2025, 61st percentile, on 275 MW net summer
0.3%Of CA generation, 2025
11 yearsAverage generator age, by MW

How hard does the Mojave Solar Project plant run compared with other solar plants?

The Mojave Solar Project plant had a capacity factor of 25% in 2025 on 275 MW of net summer capacity, the 61st percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 89 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Mojave Solar Project25%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Mojave Solar Project plant generating more or less than last year?

Generation at Mojave Solar Project fell 6.1% from 2024 to 2025, from 629,101 MWh to 590,420 MWh. Through August 2026 it is running 1.7% behind the same months of 2025.

Net generation by period
PeriodMWh
2024629,101
2025590,420
2026 through August423,966
2025, same months431,334
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202669,529
July 202676,500
June 202686,521
May 202681,920
April 202657,493
March 202622,790
February 202621,627
January 20267,586
December 202518,802
November 202522,719
October 202553,908
September 202563,657
August 202574,887
July 202584,013
June 202582,658
May 202576,166
April 202565,673
March 202514,514
February 202516,839
January 202516,584
December 202416,624
November 202425,568
October 202450,641
September 202465,982
August 202481,247
July 202480,435
June 202486,263
May 202481,200
April 202464,430
March 202440,420
February 202426,060
January 202410,231

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Mojave Solar Project plant?

Mojave Solar Project made 0.3% of the 204,542,898 MWh reported by California plants in 2025, from 0.3% of the state's 107,433 MW of capacity. By capacity it is the 84th largest of 1,877 plants in California, the 1,144th largest of 14,327 in the U.S. and the 61st largest of 7,223 solar plants. By 2025 generation it is the 63rd largest of 1,608 generating plants in the state.

Mojave Solar Project within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)280107,4330.3%
Generation (MWh)590,420204,542,8980.3%
Solar capacity (MW)28024,6631.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Mojave Solar Project plant, and when do they retire?

2 operable generators total 280 MW, with an average age of 11 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s2280100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
MSP1OperatingSolar Thermal without Energy Storage1402014n/a
MSP2OperatingSolar Thermal without Energy Storage1402014n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Mojave Solar Project plant?

EIA lists no joint owners for Mojave Solar Project. Mojave Solar LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Mojave Solar Project plant?

Mojave Solar Project is in Hinkley, San Bernardino County, California, at 35.0177° N, 117.3391° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Mojave Solar Project's 280 MW is 1% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Rexford Solar FarmTulare300690,556
Daggett 3San Bernardino300882,769
Stateline SolarSan Bernardino300640,092
Mojave Solar ProjectSan Bernardino280590,420
Solar Star 2Kern279720,719
McCoy Solar Energy Project HybridRiverside271690,152
Arica SolarRiverside263811,170

Source: EIA Forms EIA-860 and EIA-923, 2025.