Solar power plant, California
Mojave Solar Project, California
Mojave Solar Project is a 280 MW solar power plant in San Bernardino County, California, operated by Mojave Solar LLC, and it generated 590,420 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in California, and its capacity factor sits at the 61st percentile of U.S. solar plants. By 2025 generation it ranks 1,143rd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Mojave Solar Project plant run compared with other solar plants?
The Mojave Solar Project plant had a capacity factor of 25% in 2025 on 275 MW of net summer capacity, the 61st percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 89 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Mojave Solar Project | 25% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Mojave Solar Project plant generating more or less than last year?
Generation at Mojave Solar Project fell 6.1% from 2024 to 2025, from 629,101 MWh to 590,420 MWh. Through August 2026 it is running 1.7% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 629,101 |
| 2025 | 590,420 |
| 2026 through August | 423,966 |
| 2025, same months | 431,334 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 69,529 |
| July 2026 | 76,500 |
| June 2026 | 86,521 |
| May 2026 | 81,920 |
| April 2026 | 57,493 |
| March 2026 | 22,790 |
| February 2026 | 21,627 |
| January 2026 | 7,586 |
| December 2025 | 18,802 |
| November 2025 | 22,719 |
| October 2025 | 53,908 |
| September 2025 | 63,657 |
| August 2025 | 74,887 |
| July 2025 | 84,013 |
| June 2025 | 82,658 |
| May 2025 | 76,166 |
| April 2025 | 65,673 |
| March 2025 | 14,514 |
| February 2025 | 16,839 |
| January 2025 | 16,584 |
| December 2024 | 16,624 |
| November 2024 | 25,568 |
| October 2024 | 50,641 |
| September 2024 | 65,982 |
| August 2024 | 81,247 |
| July 2024 | 80,435 |
| June 2024 | 86,263 |
| May 2024 | 81,200 |
| April 2024 | 64,430 |
| March 2024 | 40,420 |
| February 2024 | 26,060 |
| January 2024 | 10,231 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Mojave Solar Project plant, and when do they retire?
2 operable generators total 280 MW, with an average age of 11 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 2 | 280 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| MSP1 | Operating | Solar Thermal without Energy Storage | 140 | 2014 | n/a |
| MSP2 | Operating | Solar Thermal without Energy Storage | 140 | 2014 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Mojave Solar Project plant?
EIA lists no joint owners for Mojave Solar Project. Mojave Solar LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Mojave Solar Project plant?
Mojave Solar Project is in Hinkley, San Bernardino County, California, at 35.0177° N, 117.3391° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Mojave Solar Project's 280 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Rexford Solar Farm | Tulare | 300 | 690,556 |
| Daggett 3 | San Bernardino | 300 | 882,769 |
| Stateline Solar | San Bernardino | 300 | 640,092 |
| Mojave Solar Project | San Bernardino | 280 | 590,420 |
| Solar Star 2 | Kern | 279 | 720,719 |
| McCoy Solar Energy Project Hybrid | Riverside | 271 | 690,152 |
| Arica Solar | Riverside | 263 | 811,170 |
Source: EIA Forms EIA-860 and EIA-923, 2025.