Solar power plant, California
Arica Solar power plant, California
Arica Solar is a 399 MW power plant, 263 MW of it solar, in Riverside County, California, operated by Arica Solar, LLC, and it generated 777,143 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in California, and its capacity factor sits at the 99th percentile of U.S. solar plants. By 2025 generation it ranks 902nd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Arica Solar plant run compared with other solar plants?
The Arica Solar plant's solar units had a capacity factor of 35% in 2025 on 263 MW of net summer capacity, the 99th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 129 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Arica Solar | 35% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.
Is the Arica Solar plant generating more or less than last year?
Arica Solar generated 777,143 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 9.7% behind the same months of 2025. 2024 has output for only 10 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 552,543 |
| 2025 | 777,143 |
| 2026 through August | 510,434 |
| 2025, same months | 565,045 |
Monthly generation, Mar 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 77,358 |
| July 2026 | 79,431 |
| June 2026 | 79,452 |
| May 2026 | 65,680 |
| April 2026 | 46,182 |
| March 2026 | 71,036 |
| February 2026 | 48,317 |
| January 2026 | 42,978 |
| December 2025 | 39,380 |
| November 2025 | 44,279 |
| October 2025 | 65,551 |
| September 2025 | 62,888 |
| August 2025 | 80,105 |
| July 2025 | 88,394 |
| June 2025 | 85,569 |
| May 2025 | 83,539 |
| April 2025 | 77,682 |
| March 2025 | 60,455 |
| February 2025 | 46,420 |
| January 2025 | 42,881 |
| December 2024 | 37,032 |
| November 2024 | 45,491 |
| October 2024 | 8,526 |
| September 2024 | 73,745 |
| August 2024 | 81,598 |
| July 2024 | 85,129 |
| June 2024 | 55,635 |
| May 2024 | 55,274 |
| April 2024 | 66,962 |
| March 2024 | 43,151 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Arica Solar plant, and when do they retire?
2 operable generators total 399 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 2 | 399 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| ARCBA | Operating | Batteries | 136 | 2024 | n/a |
| ARCPV | Operating | Solar Photovoltaic | 263 | 2024 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Arica Solar plant?
EIA lists no joint owners for Arica Solar. Arica Solar, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Arica Solar plant use?
Arica Solar has capacity on 2 fuels: 66% solar and 34% battery and pumped storage. In 2025, solar made 104% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Solar | 263 | 65.9% | 811,170 |
| Battery and pumped storage | 136 | 34.1% | -34,027 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Arica Solar plant?
Arica Solar is in Desert Center, Riverside County, California, at 33.7010° N, 115.3163° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Arica Solar's 263 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Mojave Solar Project | San Bernardino | 280 | 590,420 |
| Solar Star 2 | Kern | 279 | 720,719 |
| McCoy Solar Energy Project Hybrid | Riverside | 271 | 690,152 |
| Arica Solar | Riverside | 263 | 811,170 |
| AV Solar Ranch One | Los Angeles | 253 | 564,815 |
| Mount Signal Solar Farm V | Imperial | 252 | 674,337 |
| Genesis Solar Energy Project | Riverside | 250 | 607,891 |
Source: EIA Forms EIA-860 and EIA-923, 2025.