Mount Signal Solar Farm V power plant, California

Mount Signal Solar Farm V is a 252 MW solar power plant in Imperial County, California, operated by Imperial Valley Solar 3, LLC, and it generated 674,337 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in California, and its capacity factor sits at the 93rd percentile of U.S. solar plants. By 2025 generation it ranks 1,023rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

252 MWNameplate capacity
31%Capacity factor, 2025, 93rd percentile, on 252 MW net summer
0.3%Of CA generation, 2025
7 yearsAverage generator age, by MW

How hard does the Mount Signal Solar Farm V plant run compared with other solar plants?

The Mount Signal Solar Farm V plant had a capacity factor of 31% in 2025 on 252 MW of net summer capacity, the 93rd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 111 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Mount Signal Solar Farm V31%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Mount Signal Solar Farm V plant generating more or less than last year?

Generation at Mount Signal Solar Farm V rose 12.0% from 2024 to 2025, from 602,141 MWh to 674,337 MWh. Through August 2026 it is running 8.6% behind the same months of 2025.

Net generation by period
PeriodMWh
2024602,141
2025674,337
2026 through August450,415
2025, same months493,061
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202658,656
July 202670,805
June 202669,722
May 202670,104
April 202642,961
March 202655,709
February 202643,730
January 202638,728
December 202535,298
November 202538,222
October 202554,942
September 202552,814
August 202559,881
July 202572,887
June 202573,549
May 202573,858
April 202570,783
March 202559,672
February 202544,051
January 202538,380
December 202434,303
November 202440,191
October 202453,434
September 202463,389
August 202469,429
July 202468,239
June 202469,754
May 202451,922
April 202451,898
March 202432,915
February 202428,327
January 202438,340

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Mount Signal Solar Farm V plant?

Mount Signal Solar Farm V made 0.3% of the 204,542,898 MWh reported by California plants in 2025, from 0.2% of the state's 107,433 MW of capacity. Its share of output is 1.4 times its share of capacity. By capacity it is the 97th largest of 1,877 plants in California, the 1,227th largest of 14,327 in the U.S. and the 77th largest of 7,223 solar plants. By 2025 generation it is the 50th largest of 1,608 generating plants in the state.

Mount Signal Solar Farm V within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)252107,4330.2%
Generation (MWh)674,337204,542,8980.3%
Solar capacity (MW)25224,6631.0%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Mount Signal Solar Farm V plant, and when do they retire?

1 operable generator totals 252 MW, with an average age of 7 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1252100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
MTSG3OperatingSolar Photovoltaic2522018n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Mount Signal Solar Farm V plant?

EIA lists no joint owners for Mount Signal Solar Farm V. Imperial Valley Solar 3, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Mount Signal Solar Farm V plant?

Mount Signal Solar Farm V is in Calexico, Imperial County, California, at 32.6788° N, 115.5672° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Mount Signal Solar Farm V's 252 MW is 1% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
McCoy Solar Energy Project HybridRiverside271690,152
Arica SolarRiverside263811,170
AV Solar Ranch OneLos Angeles253564,815
Mount Signal Solar Farm VImperial252674,337
Genesis Solar Energy ProjectRiverside250607,891
AquamarineKings250662,406
Athos Solar ProjectRiverside250700,249

Source: EIA Forms EIA-860 and EIA-923, 2025.