Athos Solar Project, California

Athos Solar Project is a 250 MW solar power plant in Riverside County, California, operated by SE Athos I, LLC, and it generated 700,249 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in California, and its capacity factor sits at the 96th percentile of U.S. solar plants. By 2025 generation it ranks 990th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

250 MWNameplate capacity
32%Capacity factor, 2025, 96th percentile, on 250 MW net summer
0.3%Of CA generation, 2025
3 yearsAverage generator age, by MW

How hard does the Athos Solar Project plant run compared with other solar plants?

The Athos Solar Project plant had a capacity factor of 32% in 2025 on 250 MW of net summer capacity, the 96th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 117 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Athos Solar Project32%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Athos Solar Project plant generating more or less than last year?

Generation at Athos Solar Project rose 13.3% from 2024 to 2025, from 618,067 MWh to 700,249 MWh. Through August 2026 it is running 6.0% behind the same months of 2025.

Net generation by period
PeriodMWh
2024618,067
2025700,249
2026 through August469,620
2025, same months499,384
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202672,167
July 202666,525
June 202672,340
May 202680,774
April 202651,424
March 202647,945
February 202637,170
January 202641,275
December 202537,613
November 202541,946
October 202560,419
September 202560,887
August 202576,642
July 202583,610
June 202583,706
May 202572,402
April 202569,164
March 202534,774
February 202535,824
January 202543,262
December 202439,561
November 202446,776
October 202456,718
September 202466,708
August 202478,483
July 202482,544
June 202479,954
May 202451,639
April 202429,187
March 202420,203
February 202435,828
January 202430,466

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Athos Solar Project plant?

Athos Solar Project made 0.3% of the 204,542,898 MWh reported by California plants in 2025, from 0.2% of the state's 107,433 MW of capacity. Its share of output is 1.5 times its share of capacity. By capacity it is the 100th largest of 1,877 plants in California, the 1,239th largest of 14,327 in the U.S. and the 87th largest of 7,223 solar plants. By 2025 generation it is the 48th largest of 1,608 generating plants in the state.

Athos Solar Project within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)250107,4330.2%
Generation (MWh)700,249204,542,8980.3%
Solar capacity (MW)25024,6631.0%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Athos Solar Project plant, and when do they retire?

1 operable generator totals 250 MW, with an average age of 3 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1250100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
IPAT1OperatingSolar Photovoltaic2502022n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Athos Solar Project plant?

EIA lists no joint owners for Athos Solar Project. SE Athos I, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Athos Solar Project plant?

Athos Solar Project is in Desert Center, Riverside County, California, at 33.7513° N, 115.3550° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Athos Solar Project's 250 MW is 1% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Mount Signal Solar Farm VImperial252674,337
Genesis Solar Energy ProjectRiverside250607,891
AquamarineKings250662,406
Athos Solar ProjectRiverside250700,249
Solar BlueKings250691,363
Oberon Solar ProjectRiverside250599,752
Oberon II Solar ProjectRiverside250607,785

Source: EIA Forms EIA-860 and EIA-923, 2025.