Solar power plant, California

Oberon II Solar Project, California

Oberon II Solar Project is a 375 MW power plant, 250 MW of it solar, in Riverside County, California, operated by Intersect USA, LLC, and it generated 589,752 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in California, and its capacity factor sits at the 81st percentile of U.S. solar plants. By 2025 generation it ranks 1,144th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

375 MWNameplate capacity
28%Capacity factor, 2025, solar units, 81st percentile, on 250 MW net summer
0.3%Of CA generation, 2025
2 yearsAverage generator age, by MW

How hard does the Oberon II Solar Project plant run compared with other solar plants?

The Oberon II Solar Project plant's solar units had a capacity factor of 28% in 2025 on 250 MW of net summer capacity, the 81st percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 101 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Oberon II Solar Project28%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Oberon II Solar Project plant generating more or less than last year?

Generation at Oberon II Solar Project rose 6.4% from 2024 to 2025, from 554,406 MWh to 589,752 MWh. Through August 2026 it is running 6.9% behind the same months of 2025.

Net generation by period
PeriodMWh
2024554,406
2025589,752
2026 through August404,365
2025, same months434,112
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202662,373
July 202664,043
June 202669,130
May 202643,952
April 202650,653
March 202646,511
February 202636,349
January 202631,354
December 202524,070
November 202534,113
October 202547,833
September 202549,624
August 202565,227
July 202577,009
June 202573,760
May 202563,802
April 202551,184
March 202534,480
February 202535,507
January 202533,143
December 202428,962
November 202438,172
October 202447,514
September 202454,379
August 202467,507
July 202471,717
June 202478,500
May 202470,172
April 202432,929
March 202426,962
February 202414,746
January 202422,846

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Oberon II Solar Project plant?

Oberon II Solar Project made 0.3% of the 204,542,898 MWh reported by California plants in 2025, from 0.3% of the state's 107,433 MW of capacity. By capacity it is the 57th largest of 1,877 plants in California, the 887th largest of 14,327 in the U.S. and the 96th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 64th largest of 1,608 generating plants in the state.

Oberon II Solar Project within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)375107,4330.3%
Generation (MWh)589,752204,542,8980.3%
Solar capacity (MW)25024,6631.0%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Oberon II Solar Project plant, and when do they retire?

2 operable generators total 375 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2375100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
OBIIBOperatingBatteries1252023n/a
OBIIPOperatingSolar Photovoltaic2502023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Oberon II Solar Project plant?

EIA lists no joint owners for Oberon II Solar Project. Intersect USA, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Oberon II Solar Project plant use?

Oberon II Solar Project has capacity on 2 fuels: 67% solar and 33% battery and pumped storage. In 2025, solar made 103% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar25066.7%607,785
Battery and pumped storage12533.3%-18,033

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Oberon II Solar Project plant?

Oberon II Solar Project is in Desert Center, Riverside County, California, at 33.7290° N, 115.3824° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Oberon II Solar Project's 250 MW is 1% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Athos Solar ProjectRiverside250700,249
Solar BlueKings250691,363
Oberon Solar ProjectRiverside250599,752
Oberon II Solar ProjectRiverside250607,785
California Valley Solar RanchSan Luis Obispo250558,684
Desert Sunlight 250, LLCRiverside250516,827
Arlington Energy Center IIRiverside233658,070

Source: EIA Forms EIA-860 and EIA-923, 2025.