Solar power plant, California

Desert Sunlight 250, LLC solar power plant, California

Desert Sunlight 250, LLC is a 250 MW solar power plant in Riverside County, California, operated by NextEra Energy Desert Sunlight 250, LLC, and it generated 516,827 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in California, and its capacity factor sits at the 54th percentile of U.S. solar plants. By 2025 generation it ranks 1,309th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

250 MWNameplate capacity
24%Capacity factor, 2025, 54th percentile, on 250 MW net summer
0.3%Of CA generation, 2025
11 yearsAverage generator age, by MW

How hard does the Desert Sunlight 250, LLC plant run compared with other solar plants?

The Desert Sunlight 250, LLC plant had a capacity factor of 24% in 2025 on 250 MW of net summer capacity, the 54th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 86 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Desert Sunlight 250, LLC24%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Desert Sunlight 250, LLC plant generating more or less than last year?

Generation at Desert Sunlight 250, LLC fell 7.0% from 2024 to 2025, from 555,744 MWh to 516,827 MWh.

Net generation by period
PeriodMWh
2024555,744
2025516,827
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202534,921
November 202537,830
October 202547,447
September 202546,859
August 202554,131
July 202557,757
June 202554,357
May 202549,419
April 202543,155
March 202529,041
February 202527,035
January 202534,875
December 202437,835
November 202437,669
October 202441,535
September 202452,098
August 202455,732
July 202455,354
June 202457,107
May 202455,006
April 202450,056
March 202445,081
February 202437,927
January 202430,344

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Desert Sunlight 250, LLC plant?

Desert Sunlight 250, LLC made 0.3% of the 204,542,898 MWh reported by California plants in 2025, from 0.2% of the state's 107,433 MW of capacity. By capacity it is the 106th largest of 1,877 plants in California, the 1,283rd largest of 14,327 in the U.S. and the 108th largest of 7,223 solar plants. By 2025 generation it is the 80th largest of 1,608 generating plants in the state.

Desert Sunlight 250, LLC within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)250107,4330.2%
Generation (MWh)516,827204,542,8980.3%
Solar capacity (MW)25024,6631.0%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Desert Sunlight 250, LLC plant, and when do they retire?

9 operable generators total 250 MW, with an average age of 11 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s9250100%none reported
Every generator, 9 in all
UnitStatusTechnologyMWIn servicePlanned retirement
DSL12OperatingSolar Photovoltaic392013n/a
DSL16OperatingSolar Photovoltaic232013n/a
DSL17OperatingSolar Photovoltaic292013n/a
DSL20OperatingSolar Photovoltaic252013n/a
DSL13OperatingSolar Photovoltaic392014n/a
DSL14OperatingSolar Photovoltaic272014n/a
DSL15OperatingSolar Photovoltaic142014n/a
DSL18OperatingSolar Photovoltaic292014n/a
DSL19OperatingSolar Photovoltaic252014n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Desert Sunlight 250, LLC plant?

7 owners report shares in Desert Sunlight 250, LLC; Shaw Creek Solar holds the largest named share, 31.8% or about 79.5 MW. NextEra Energy Desert Sunlight 250, LLC operates the plant.

Reported ownership of operable capacity
OwnerShareMW2025 MWh, by share
Shaw Creek Solar31.8%80164,558
NRG Yield LLC25.0%62129,207
CalPERS17.8%4492,099
NextEra Energy Partners LP12.8%3266,412
Harbert Power Fund V6.3%1632,663
NextEra Energy Desert Sunlight 250, LLC5.3%1327,444
Sumitomo Corporation of America0.9%24,445

Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.

Where is the Desert Sunlight 250, LLC plant?

Desert Sunlight 250, LLC is in Desert Center, Riverside County, California, at 33.8055° N, 115.3947° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Desert Sunlight 250, LLC's 250 MW is 1% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Oberon Solar ProjectRiverside250599,752
Oberon II Solar ProjectRiverside250607,785
California Valley Solar RanchSan Luis Obispo250558,684
Desert Sunlight 250, LLCRiverside250516,827
Arlington Energy Center IIRiverside233658,070
Blythe Mesa Solar IIRiverside224601,270
RE TranquillityFresno205495,073

Source: EIA Forms EIA-860 and EIA-923, 2025.