Solar power plant, California

Arlington Energy Center II solar power plant, California

Arlington Energy Center II is a 365 MW power plant, 233 MW of it solar, in Riverside County, California, operated by Arlington Energy Center II, and it generated 633,467 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in California, and its capacity factor sits at the 97th percentile of U.S. solar plants. By 2025 generation it ranks 1,081st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

365 MWNameplate capacity
32%Capacity factor, 2025, solar units, 97th percentile, on 233 MW net summer
0.3%Of CA generation, 2025
3 yearsAverage generator age, by MW

How hard does the Arlington Energy Center II plant run compared with other solar plants?

The Arlington Energy Center II plant's solar units had a capacity factor of 32% in 2025 on 233 MW of net summer capacity, the 97th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 118 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Arlington Energy Center II32%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Arlington Energy Center II plant generating more or less than last year?

Generation at Arlington Energy Center II fell 0.3% from 2024 to 2025, from 635,630 MWh to 633,467 MWh. Through August 2026 it is running 2.0% behind the same months of 2025.

Net generation by period
PeriodMWh
2024635,630
2025633,467
2026 through August447,001
2025, same months456,222
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202646,907
July 202662,004
June 202672,838
May 202672,717
April 202658,336
March 202655,176
February 202642,087
January 202636,936
December 202534,558
November 202535,392
October 202554,081
September 202553,214
August 202562,358
July 202562,938
June 202573,114
May 202569,912
April 202564,154
March 202547,946
February 202538,947
January 202536,853
December 202433,824
November 202439,409
October 202450,738
September 202456,533
August 202461,913
July 202466,407
June 202466,697
May 202472,103
April 202463,355
March 202453,880
February 202439,701
January 202431,070

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Arlington Energy Center II plant?

Arlington Energy Center II made 0.3% of the 204,542,898 MWh reported by California plants in 2025, from 0.3% of the state's 107,433 MW of capacity. By capacity it is the 59th largest of 1,877 plants in California, the 899th largest of 14,327 in the U.S. and the 121st largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 59th largest of 1,608 generating plants in the state.

Arlington Energy Center II within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)365107,4330.3%
Generation (MWh)633,467204,542,8980.3%
Solar capacity (MW)23324,6630.9%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Arlington Energy Center II plant, and when do they retire?

3 operable generators total 365 MW, with an average age of 3 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s3365100%none reported
Every generator, 3 in all
UnitStatusTechnologyMWIn servicePlanned retirement
AEC1OperatingSolar Photovoltaic1002022n/a
AEC2BOperatingBatteries1322022n/a
AEC2OperatingSolar Photovoltaic1332023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Arlington Energy Center II plant?

EIA lists no joint owners for Arlington Energy Center II. Arlington Energy Center II operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Arlington Energy Center II plant use?

Arlington Energy Center II has capacity on 2 fuels: 64% solar and 36% battery and pumped storage. In 2025, solar made 104% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar23363.8%658,070
Battery and pumped storage13236.2%-24,603

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Arlington Energy Center II plant?

Arlington Energy Center II is in Blythe, Riverside County, California, at 33.6909° N, 114.7749° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Arlington Energy Center II's 233 MW is 1% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Oberon II Solar ProjectRiverside250607,785
California Valley Solar RanchSan Luis Obispo250558,684
Desert Sunlight 250, LLCRiverside250516,827
Arlington Energy Center IIRiverside233658,070
Blythe Mesa Solar IIRiverside224601,270
RE TranquillityFresno205495,073
Great Valley Solar Portfolio Holdings, LFresno203503,173

Source: EIA Forms EIA-860 and EIA-923, 2025.