California Valley Solar Ranch is a 250 MW solar power plant in San Luis Obispo County, California, operated by Clearway Energy Operating LLC, and it generated 558,684 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in California, and its capacity factor sits at the 69th percentile of U.S. solar plants. By 2025 generation it ranks 1,215th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the California Valley Solar Ranch plant run compared with other solar plants?
The California Valley Solar Ranch plant had a capacity factor of 26% in 2025 on 250 MW of net summer capacity, the 69th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 93 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| California Valley Solar Ranch | 26% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the California Valley Solar Ranch plant generating more or less than last year?
Generation at California Valley Solar Ranch fell 6.5% from 2024 to 2025, from 597,676 MWh to 558,684 MWh.
| Period | MWh |
|---|---|
| 2024 | 597,676 |
| 2025 | 558,684 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 30,234 |
| November 2025 | 30,741 |
| October 2025 | 41,449 |
| September 2025 | 53,216 |
| August 2025 | 71,058 |
| July 2025 | 78,850 |
| June 2025 | 71,925 |
| May 2025 | 67,336 |
| April 2025 | 35,414 |
| March 2025 | 22,740 |
| February 2025 | 19,717 |
| January 2025 | 36,004 |
| December 2024 | 25,449 |
| November 2024 | 22,148 |
| October 2024 | 45,799 |
| September 2024 | 56,745 |
| August 2024 | 72,249 |
| July 2024 | 76,630 |
| June 2024 | 75,098 |
| May 2024 | 62,516 |
| April 2024 | 51,599 |
| March 2024 | 46,538 |
| February 2024 | 35,759 |
| January 2024 | 27,146 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the California Valley Solar Ranch plant, and when do they retire?
5 operable generators total 250 MW, with an average age of 12 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 5 | 250 | 100% | none reported |
Every generator, 5 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| HPR2A | Operating | Solar Photovoltaic | 21 | 2012 | n/a |
| HPR2 | Operating | Solar Photovoltaic | 32 | 2013 | n/a |
| HPR2B | Operating | Solar Photovoltaic | 87 | 2013 | n/a |
| HPR2C | Operating | Solar Photovoltaic | 70 | 2013 | n/a |
| HPR2D | Operating | Solar Photovoltaic | 40 | 2013 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the California Valley Solar Ranch plant?
High Plains Ranch II, LLC is the only joint owner reported for California Valley Solar Ranch, with 100.0%. Clearway Energy Operating LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the California Valley Solar Ranch plant?
California Valley Solar Ranch is in California Valley, San Luis Obispo County, California, at 35.3237° N, 119.9166° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and California Valley Solar Ranch's 250 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Solar Blue | Kings | 250 | 691,363 |
| Oberon Solar Project | Riverside | 250 | 599,752 |
| Oberon II Solar Project | Riverside | 250 | 607,785 |
| California Valley Solar Ranch | San Luis Obispo | 250 | 558,684 |
| Desert Sunlight 250, LLC | Riverside | 250 | 516,827 |
| Arlington Energy Center II | Riverside | 233 | 658,070 |
| Blythe Mesa Solar II | Riverside | 224 | 601,270 |