Solar Blue power plant, California

Solar Blue is a 475 MW power plant, 250 MW of it solar, in Kings County, California, operated by Westlands Solar Blue, and it generated 652,177 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in California, and its capacity factor sits at the 96th percentile of U.S. solar plants. By 2025 generation it ranks 1,052nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

475 MWNameplate capacity
32%Capacity factor, 2025, solar units, 96th percentile, on 250 MW net summer
0.3%Of CA generation, 2025
2 yearsAverage generator age, by MW

How hard does the Solar Blue plant run compared with other solar plants?

The Solar Blue plant's solar units had a capacity factor of 32% in 2025 on 250 MW of net summer capacity, the 96th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 115 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Solar Blue32%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Solar Blue plant generating more or less than last year?

Generation at Solar Blue rose 11.4% from 2024 to 2025, from 585,413 MWh to 652,177 MWh. Through August 2026 it is running 1.4% behind the same months of 2025.

Net generation by period
PeriodMWh
2024585,413
2025652,177
2026 through August501,996
2025, same months509,017
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202671,769
July 202682,147
June 202683,921
May 202675,645
April 202664,745
March 202662,541
February 202637,004
January 202624,224
December 20259,074
November 202518,926
October 202552,604
September 202562,556
August 202571,402
July 202583,856
June 202582,519
May 202582,378
April 202563,446
March 202553,762
February 202537,793
January 202533,861
December 202422,274
November 202420,381
October 202443,885
September 202458,439
August 202472,027
July 202475,493
June 202477,183
May 202475,466
April 202461,507
March 202434,843
February 202417,433
January 202426,482

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Solar Blue plant?

Solar Blue made 0.3% of the 204,542,898 MWh reported by California plants in 2025, from 0.4% of the state's 107,433 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 43rd largest of 1,877 plants in California, the 768th largest of 14,327 in the U.S. and the 89th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 56th largest of 1,608 generating plants in the state.

Solar Blue within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)475107,4330.4%
Generation (MWh)652,177204,542,8980.3%
Solar capacity (MW)25024,6631.0%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Solar Blue plant, and when do they retire?

2 operable generators total 475 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2475100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
BESS1OperatingBatteries2252023n/a
SBLUEOperatingSolar Photovoltaic2502023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Solar Blue plant?

EIA lists no joint owners for Solar Blue. Westlands Solar Blue operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Solar Blue plant use?

Solar Blue has capacity on 2 fuels: 53% solar and 47% battery and pumped storage. In 2025, solar made 106% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar25052.6%691,363
Battery and pumped storage22547.4%-39,186

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Solar Blue plant?

Solar Blue is in Lemoore, Kings County, California, at 36.1740° N, 119.9043° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Solar Blue's 250 MW is 1% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Genesis Solar Energy ProjectRiverside250607,891
AquamarineKings250662,406
Athos Solar ProjectRiverside250700,249
Solar BlueKings250691,363
Oberon Solar ProjectRiverside250599,752
Oberon II Solar ProjectRiverside250607,785
California Valley Solar RanchSan Luis Obispo250558,684

Source: EIA Forms EIA-860 and EIA-923, 2025.