Solar power plant, California
Oberon Solar Project, California
Oberon Solar Project is a 375 MW power plant, 250 MW of it solar, in Riverside County, California, operated by Intersect USA, LLC, and it generated 581,451 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in California, and its capacity factor sits at the 80th percentile of U.S. solar plants. By 2025 generation it ranks 1,163rd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Oberon Solar Project plant run compared with other solar plants?
The Oberon Solar Project plant's solar units had a capacity factor of 27% in 2025 on 250 MW of net summer capacity, the 80th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 100 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Oberon Solar Project | 27% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.
Is the Oberon Solar Project plant generating more or less than last year?
Generation at Oberon Solar Project rose 11.3% from 2024 to 2025, from 522,347 MWh to 581,451 MWh. Through August 2026 it is running 5.8% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 522,347 |
| 2025 | 581,451 |
| 2026 through August | 397,921 |
| 2025, same months | 422,358 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 63,195 |
| July 2026 | 66,720 |
| June 2026 | 71,959 |
| May 2026 | 37,256 |
| April 2026 | 47,671 |
| March 2026 | 43,975 |
| February 2026 | 34,606 |
| January 2026 | 32,539 |
| December 2025 | 25,001 |
| November 2025 | 34,388 |
| October 2025 | 50,158 |
| September 2025 | 49,546 |
| August 2025 | 64,798 |
| July 2025 | 77,214 |
| June 2025 | 72,919 |
| May 2025 | 68,678 |
| April 2025 | 51,308 |
| March 2025 | 25,186 |
| February 2025 | 28,888 |
| January 2025 | 33,367 |
| December 2024 | 30,161 |
| November 2024 | 32,756 |
| October 2024 | 46,172 |
| September 2024 | 52,882 |
| August 2024 | 66,840 |
| July 2024 | 74,125 |
| June 2024 | 77,026 |
| May 2024 | 45,192 |
| April 2024 | 32,184 |
| March 2024 | 27,524 |
| February 2024 | 14,161 |
| January 2024 | 23,324 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Oberon Solar Project plant, and when do they retire?
2 operable generators total 375 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 2 | 375 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| OBIBS | Operating | Batteries | 125 | 2023 | n/a |
| OBIPV | Operating | Solar Photovoltaic | 250 | 2023 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Oberon Solar Project plant?
EIA lists no joint owners for Oberon Solar Project. Intersect USA, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Oberon Solar Project plant use?
Oberon Solar Project has capacity on 2 fuels: 67% solar and 33% battery and pumped storage. In 2025, solar made 103% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Solar | 250 | 66.7% | 599,752 |
| Battery and pumped storage | 125 | 33.3% | -18,301 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Oberon Solar Project plant?
Oberon Solar Project is in Desert Center, Riverside County, California, at 33.7290° N, 115.3824° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Oberon Solar Project's 250 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Aquamarine | Kings | 250 | 662,406 |
| Athos Solar Project | Riverside | 250 | 700,249 |
| Solar Blue | Kings | 250 | 691,363 |
| Oberon Solar Project | Riverside | 250 | 599,752 |
| Oberon II Solar Project | Riverside | 250 | 607,785 |
| California Valley Solar Ranch | San Luis Obispo | 250 | 558,684 |
| Desert Sunlight 250, LLC | Riverside | 250 | 516,827 |
Source: EIA Forms EIA-860 and EIA-923, 2025.