Oberon Solar Project, California

Oberon Solar Project is a 375 MW power plant, 250 MW of it solar, in Riverside County, California, operated by Intersect USA, LLC, and it generated 581,451 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in California, and its capacity factor sits at the 80th percentile of U.S. solar plants. By 2025 generation it ranks 1,163rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

375 MWNameplate capacity
27%Capacity factor, 2025, solar units, 80th percentile, on 250 MW net summer
0.3%Of CA generation, 2025
2 yearsAverage generator age, by MW

How hard does the Oberon Solar Project plant run compared with other solar plants?

The Oberon Solar Project plant's solar units had a capacity factor of 27% in 2025 on 250 MW of net summer capacity, the 80th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 100 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Oberon Solar Project27%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Oberon Solar Project plant generating more or less than last year?

Generation at Oberon Solar Project rose 11.3% from 2024 to 2025, from 522,347 MWh to 581,451 MWh. Through August 2026 it is running 5.8% behind the same months of 2025.

Net generation by period
PeriodMWh
2024522,347
2025581,451
2026 through August397,921
2025, same months422,358
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202663,195
July 202666,720
June 202671,959
May 202637,256
April 202647,671
March 202643,975
February 202634,606
January 202632,539
December 202525,001
November 202534,388
October 202550,158
September 202549,546
August 202564,798
July 202577,214
June 202572,919
May 202568,678
April 202551,308
March 202525,186
February 202528,888
January 202533,367
December 202430,161
November 202432,756
October 202446,172
September 202452,882
August 202466,840
July 202474,125
June 202477,026
May 202445,192
April 202432,184
March 202427,524
February 202414,161
January 202423,324

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Oberon Solar Project plant?

Oberon Solar Project made 0.3% of the 204,542,898 MWh reported by California plants in 2025, from 0.3% of the state's 107,433 MW of capacity. By capacity it is the 57th largest of 1,877 plants in California, the 887th largest of 14,327 in the U.S. and the 95th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 67th largest of 1,608 generating plants in the state.

Oberon Solar Project within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)375107,4330.3%
Generation (MWh)581,451204,542,8980.3%
Solar capacity (MW)25024,6631.0%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Oberon Solar Project plant, and when do they retire?

2 operable generators total 375 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2375100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
OBIBSOperatingBatteries1252023n/a
OBIPVOperatingSolar Photovoltaic2502023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Oberon Solar Project plant?

EIA lists no joint owners for Oberon Solar Project. Intersect USA, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Oberon Solar Project plant use?

Oberon Solar Project has capacity on 2 fuels: 67% solar and 33% battery and pumped storage. In 2025, solar made 103% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar25066.7%599,752
Battery and pumped storage12533.3%-18,301

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Oberon Solar Project plant?

Oberon Solar Project is in Desert Center, Riverside County, California, at 33.7290° N, 115.3824° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Oberon Solar Project's 250 MW is 1% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
AquamarineKings250662,406
Athos Solar ProjectRiverside250700,249
Solar BlueKings250691,363
Oberon Solar ProjectRiverside250599,752
Oberon II Solar ProjectRiverside250607,785
California Valley Solar RanchSan Luis Obispo250558,684
Desert Sunlight 250, LLCRiverside250516,827

Source: EIA Forms EIA-860 and EIA-923, 2025.