Skip to main content
RateWatt

Solar power plant, California

McCoy Solar Energy Project Hybrid power plant, California

McCoy Solar Energy Project Hybrid is a 501 MW power plant, 271 MW of it solar, in Riverside County, California, operated by McCoy Solar, LLC, and it generated 638,685 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in California, and its capacity factor sits at the 87th percentile of U.S. solar plants. By 2025 generation it ranks 1,078th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

501 MWNameplate capacity
29%Capacity factor, 2025, solar units, 87th percentile, on 271 MW net summer
0.3%Of CA generation, 2025
7 yearsAverage generator age, by MW

How hard does the McCoy Solar Energy Project Hybrid plant run compared with other solar plants?

The McCoy Solar Energy Project Hybrid plant's solar units had a capacity factor of 29% in 2025 on 271 MW of net summer capacity, the 87th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 106 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
McCoy Solar Energy Project Hybrid29%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the McCoy Solar Energy Project Hybrid plant generating more or less than last year?

Generation at McCoy Solar Energy Project Hybrid fell 1.2% from 2024 to 2025, from 646,706 MWh to 638,685 MWh.

Net generation by period
PeriodMWh
2024646,706
2025638,685
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202532,598
November 202535,625
October 202553,229
September 202553,068
August 202566,662
July 202575,036
June 202576,199
May 202572,702
April 202542,205
March 202554,226
February 202540,348
January 202536,787
December 202433,006
November 202440,061
October 202449,250
September 202458,938
August 202466,852
July 202470,146
June 202471,630
May 202473,997
April 202463,998
March 202452,242
February 202436,517
January 202430,069

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the McCoy Solar Energy Project Hybrid plant?

McCoy Solar Energy Project Hybrid made 0.3% of the 204,542,898 MWh reported by California plants in 2025, from 0.5% of the state's 107,433 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 41st largest of 1,877 plants in California, the 730th largest of 14,327 in the U.S. and the 66th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 58th largest of 1,608 generating plants in the state.

McCoy Solar Energy Project Hybrid within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)501107,4330.5%
Generation (MWh)638,685204,542,8980.3%
Solar capacity (MW)27124,6631.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the McCoy Solar Energy Project Hybrid plant, and when do they retire?

9 operable generators total 501 MW, with an average age of 7 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s827154%none reported
2020s123046%none reported
Every generator, 9 in all
UnitStatusTechnologyMWIn servicePlanned retirement
BLK4OperatingSolar Photovoltaic312015n/a
BLK5OperatingSolar Photovoltaic312015n/a
BLK6OperatingSolar Photovoltaic272015n/a
BLK8OperatingSolar Photovoltaic372015n/a
1OperatingSolar Photovoltaic422016n/a
BLK2OperatingSolar Photovoltaic212016n/a
BLK3OperatingSolar Photovoltaic402016n/a
BLK7OperatingSolar Photovoltaic422016n/a
MCST1OperatingBatteries2302021n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the McCoy Solar Energy Project Hybrid plant?

EIA lists no joint owners for McCoy Solar Energy Project Hybrid. McCoy Solar, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the McCoy Solar Energy Project Hybrid plant use?

McCoy Solar Energy Project Hybrid has capacity on 2 fuels: 54% solar and 46% battery and pumped storage. In 2025, solar made 108% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar27154.1%690,152
Battery and pumped storage23045.9%-51,467

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the McCoy Solar Energy Project Hybrid plant?

McCoy Solar Energy Project Hybrid is in Blythe, Riverside County, California, at 33.6947° N, 114.7397° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and McCoy Solar Energy Project Hybrid's 271 MW is 1% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Stateline SolarSan Bernardino300640,092
Mojave Solar ProjectSan Bernardino280590,420
Solar Star 2Kern279720,719
McCoy Solar Energy Project HybridRiverside271690,152
Arica SolarRiverside263811,170
AV Solar Ranch OneLos Angeles253564,815
Mount Signal Solar Farm VImperial252674,337

Source: EIA Forms EIA-860 and EIA-923, 2025.