Solar Star 2 is a 279 MW solar power plant in Kern County, California, operated by Solar Star California XX, LLC, and it generated 720,719 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in California, and its capacity factor sits at the 90th percentile of U.S. solar plants. By 2025 generation it ranks 967th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

279 MWNameplate capacity
30%Capacity factor, 2025, 90th percentile, on 275 MW net summer
0.4%Of CA generation, 2025
11 yearsAverage generator age, by MW

How hard does the Solar Star 2 plant run compared with other solar plants?

The Solar Star 2 plant had a capacity factor of 30% in 2025 on 275 MW of net summer capacity, the 90th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 109 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Solar Star 230%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Solar Star 2 plant generating more or less than last year?

Generation at Solar Star 2 rose 0.8% from 2024 to 2025, from 715,347 MWh to 720,719 MWh. Through August 2026 it is running 9.3% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024715,347
2025720,719
2026 through August568,823
2025, same months520,468
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202678,144
July 202683,606
June 202692,644
May 202687,040
April 202675,139
March 202669,204
February 202644,419
January 202638,627
December 202535,887
November 202535,792
October 202562,060
September 202566,512
August 202573,235
July 202580,637
June 202578,959
May 202570,845
April 202567,748
March 202561,148
February 202545,050
January 202542,846
December 202434,344
November 202438,517
October 202454,396
September 202464,431
August 202476,355
July 202476,679
June 202480,973
May 202481,776
April 202471,630
March 202457,741
February 202441,267
January 202437,238

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Solar Star 2 plant?

Solar Star 2 made 0.4% of the 204,542,898 MWh reported by California plants in 2025, from 0.3% of the state's 107,433 MW of capacity. Its share of output is 1.4 times its share of capacity. By capacity it is the 85th largest of 1,877 plants in California, the 1,148th largest of 14,327 in the U.S. and the 62nd largest of 7,223 solar plants. By 2025 generation it is the 47th largest of 1,608 generating plants in the state.

Solar Star 2 within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)279107,4330.3%
Generation (MWh)720,719204,542,8980.4%
Solar capacity (MW)27924,6631.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Solar Star 2 plant, and when do they retire?

6 operable generators total 279 MW, with an average age of 11 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s6279100%none reported
Every generator, 6 in all
UnitStatusTechnologyMWIn servicePlanned retirement
AVS2OperatingSolar Photovoltaic202014n/a
SS21OperatingSolar Photovoltaic602014n/a
SS22OperatingSolar Photovoltaic562014n/a
SS23OperatingSolar Photovoltaic482014n/a
SS25OperatingSolar Photovoltaic532014n/a
SS24OperatingSolar Photovoltaic442015n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Solar Star 2 plant?

EIA lists no joint owners for Solar Star 2. Solar Star California XX, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Solar Star 2 plant?

Solar Star 2 is in Rosamond, Kern County, California, at 34.8486° N, 118.3528° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Solar Star 2's 279 MW is 1% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Daggett 3San Bernardino300882,769
Stateline SolarSan Bernardino300640,092
Mojave Solar ProjectSan Bernardino280590,420
Solar Star 2Kern279720,719
McCoy Solar Energy Project HybridRiverside271690,152
Arica SolarRiverside263811,170
AV Solar Ranch OneLos Angeles253564,815