Solar power plant, California
Solar Star 2 power plant, California
Solar Star 2 is a 279 MW solar power plant in Kern County, California, operated by Solar Star California XX, LLC, and it generated 720,719 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in California, and its capacity factor sits at the 90th percentile of U.S. solar plants. By 2025 generation it ranks 967th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Solar Star 2 plant run compared with other solar plants?
The Solar Star 2 plant had a capacity factor of 30% in 2025 on 275 MW of net summer capacity, the 90th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 109 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Solar Star 2 | 30% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Solar Star 2 plant generating more or less than last year?
Generation at Solar Star 2 rose 0.8% from 2024 to 2025, from 715,347 MWh to 720,719 MWh. Through August 2026 it is running 9.3% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 715,347 |
| 2025 | 720,719 |
| 2026 through August | 568,823 |
| 2025, same months | 520,468 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 78,144 |
| July 2026 | 83,606 |
| June 2026 | 92,644 |
| May 2026 | 87,040 |
| April 2026 | 75,139 |
| March 2026 | 69,204 |
| February 2026 | 44,419 |
| January 2026 | 38,627 |
| December 2025 | 35,887 |
| November 2025 | 35,792 |
| October 2025 | 62,060 |
| September 2025 | 66,512 |
| August 2025 | 73,235 |
| July 2025 | 80,637 |
| June 2025 | 78,959 |
| May 2025 | 70,845 |
| April 2025 | 67,748 |
| March 2025 | 61,148 |
| February 2025 | 45,050 |
| January 2025 | 42,846 |
| December 2024 | 34,344 |
| November 2024 | 38,517 |
| October 2024 | 54,396 |
| September 2024 | 64,431 |
| August 2024 | 76,355 |
| July 2024 | 76,679 |
| June 2024 | 80,973 |
| May 2024 | 81,776 |
| April 2024 | 71,630 |
| March 2024 | 57,741 |
| February 2024 | 41,267 |
| January 2024 | 37,238 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Solar Star 2 plant, and when do they retire?
6 operable generators total 279 MW, with an average age of 11 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 6 | 279 | 100% | none reported |
Every generator, 6 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| AVS2 | Operating | Solar Photovoltaic | 20 | 2014 | n/a |
| SS21 | Operating | Solar Photovoltaic | 60 | 2014 | n/a |
| SS22 | Operating | Solar Photovoltaic | 56 | 2014 | n/a |
| SS23 | Operating | Solar Photovoltaic | 48 | 2014 | n/a |
| SS25 | Operating | Solar Photovoltaic | 53 | 2014 | n/a |
| SS24 | Operating | Solar Photovoltaic | 44 | 2015 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Solar Star 2 plant?
EIA lists no joint owners for Solar Star 2. Solar Star California XX, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Solar Star 2 plant?
Solar Star 2 is in Rosamond, Kern County, California, at 34.8486° N, 118.3528° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Solar Star 2's 279 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Daggett 3 | San Bernardino | 300 | 882,769 |
| Stateline Solar | San Bernardino | 300 | 640,092 |
| Mojave Solar Project | San Bernardino | 280 | 590,420 |
| Solar Star 2 | Kern | 279 | 720,719 |
| McCoy Solar Energy Project Hybrid | Riverside | 271 | 690,152 |
| Arica Solar | Riverside | 263 | 811,170 |
| AV Solar Ranch One | Los Angeles | 253 | 564,815 |
Source: EIA Forms EIA-860 and EIA-923, 2025.