Solar power plant, California

Eland Solar & Storage Center, Phase 1 Hy power plant, California

Eland Solar & Storage Center, Phase 1 Hy is a 460 MW power plant, 310 MW of it solar, in Kern County, California, operated by 68SF 8me LLC, and it generated 684,009 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in California, and its capacity factor sits at the 100th percentile of U.S. solar plants. By 2025 generation it ranks 1,010th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

460 MWNameplate capacity
40%Capacity factor, 2025, solar units, 100th percentile, on 200 MW net summer
0.3%Of CA generation, 2025
1 yearAverage generator age, by MW

How hard does the Eland Solar & Storage Center, Phase 1 Hy plant run compared with other solar plants?

The Eland Solar & Storage Center, Phase 1 Hy plant's solar units had a capacity factor of 40% in 2025 on 200 MW of net summer capacity, the 100th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 147 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Eland Solar & Storage Center, Phase 1 Hy40%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Eland Solar & Storage Center, Phase 1 Hy plant generating more or less than last year?

Eland Solar & Storage Center, Phase 1 Hy generated 684,009 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 2.9% ahead of the same months of 2025. 2024 has output for only 2 months, so the two years are not compared.

Net generation by period
PeriodMWh
202468,309
2025684,009
2026 through August486,897
2025, same months473,008
Monthly generation, Nov 2024 to Aug 2026
MonthMWh
August 202672,481
July 202675,719
June 202683,213
May 202675,428
April 202657,071
March 202654,048
February 202635,149
January 202633,788
December 202535,590
November 202540,402
October 202567,274
September 202567,735
August 202579,394
July 202587,457
June 202583,927
May 202565,932
April 202518,972
March 202550,145
February 202543,601
January 202543,580
December 202433,116
November 202435,193

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Eland Solar & Storage Center, Phase 1 Hy plant?

Eland Solar & Storage Center, Phase 1 Hy made 0.3% of the 204,542,898 MWh reported by California plants in 2025, from 0.4% of the state's 107,433 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 44th largest of 1,877 plants in California, the 786th largest of 14,327 in the U.S. and the 36th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 49th largest of 1,608 generating plants in the state.

Eland Solar & Storage Center, Phase 1 Hy within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)460107,4330.4%
Generation (MWh)684,009204,542,8980.3%
Solar capacity (MW)31024,6631.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Eland Solar & Storage Center, Phase 1 Hy plant, and when do they retire?

2 operable generators total 460 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2460100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
68SF8OperatingSolar Photovoltaic3102024n/a
61168OperatingBatteries1502024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Eland Solar & Storage Center, Phase 1 Hy plant?

Arevon Asset Management is the only joint owner reported for Eland Solar & Storage Center, Phase 1 Hy, with 100.0%. 68SF 8me LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Eland Solar & Storage Center, Phase 1 Hy plant use?

Eland Solar & Storage Center, Phase 1 Hy has capacity on 2 fuels: 67% solar and 33% battery and pumped storage. In 2025, solar made 103% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar31067.4%706,222
Battery and pumped storage15032.6%-22,213

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Eland Solar & Storage Center, Phase 1 Hy plant?

Eland Solar & Storage Center, Phase 1 Hy is in Mojave, Kern County, California, at 35.2237° N, 117.9770° W. It sits in the Los Angeles Department of Water and Power balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Eland Solar & Storage Center, Phase 1 Hy's 310 MW is 1% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Bellefield Solar and Energy Storage FarmKern50057,898
Solar Star 1Kern318897,067
Desert Sunlight 300, LLCRiverside314620,193
Eland Solar & Storage Center, Phase 1 HyKern310706,222
Eland Solar & Storage Center, Phase 2 HyKern308268,356
Desert QuartziteRiverside300843,910
Slate HybridKings300753,467

Source: EIA Forms EIA-860 and EIA-923, 2025.