Wind power plant, Iowa

Upland Prairie wind power plant, Iowa

Upland Prairie is a 299 MW wind power plant in Clay County, Iowa, operated by Interstate Power and Light Co, and it generated 1,084,946 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.5% of the generation reported in Iowa, and its capacity factor sits at the 79th percentile of U.S. wind plants. By 2025 generation it ranks 702nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

299 MWNameplate capacity
41%Capacity factor, 2025, 79th percentile, on 299 MW net summer
1.5%Of IA generation, 2025
6 yearsAverage generator age, by MW

How hard does the Upland Prairie plant run compared with other wind plants?

The Upland Prairie plant had a capacity factor of 41% in 2025 on 299 MW of net summer capacity, the 79th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 151 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Upland Prairie41%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Upland Prairie plant generating more or less than last year?

Generation at Upland Prairie fell 0.6% from 2024 to 2025, from 1,091,512 MWh to 1,084,946 MWh. Through August 2026 it is running 1.0% behind the same months of 2025.

Net generation by period
PeriodMWh
20241,091,512
20251,084,946
2026 through August696,888
2025, same months704,161
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202651,562
July 202644,523
June 202680,397
May 202691,694
April 2026120,158
March 2026113,089
February 202694,075
January 2026101,390
December 2025105,933
November 2025101,390
October 2025114,583
September 202558,879
August 202546,198
July 202551,803
June 202574,269
May 202575,690
April 2025120,778
March 2025123,865
February 2025107,494
January 2025104,064
December 202491,051
November 202484,273
October 2024119,828
September 202479,247
August 202452,095
July 202450,189
June 202485,907
May 202498,538
April 2024133,119
March 2024112,403
February 202496,569
January 202488,293

Source: EIA Form EIA-923, through August 2026.

How much of Iowa's electricity comes from the Upland Prairie plant?

Upland Prairie made 1.5% of the 74,502,373 MWh reported by Iowa plants in 2025, from 1.2% of the state's 24,817 MW of capacity. Its share of output is 1.2 times its share of capacity. By capacity it is the 18th largest of 306 plants in Iowa, the 1,091st largest of 14,327 in the U.S. and the 92nd largest of 1,358 wind plants. By 2025 generation it is the 16th largest of 283 generating plants in the state.

Upland Prairie within Iowa, 2025
MeasureThis plantIowaShare
Capacity (MW)29924,8171.2%
Generation (MWh)1,084,94674,502,3731.5%
Wind capacity (MW)29913,4102.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Upland Prairie plant, and when do they retire?

1 operable generator totals 299 MW, with an average age of 6 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1299100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingOnshore Wind Turbine2992019n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Upland Prairie plant?

EIA lists no joint owners for Upland Prairie. Interstate Power and Light Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Interstate Power and Light Co charge homes?

Interstate Power and Light Co, the operator of Upland Prairie, had an average residential price of 17.77¢ per kWh and an average bill of $131 a month in 2025, 30% above the Iowa average of 13.62¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Iowa
Interstate Power and Light Co17.77¢$13130% higher
Iowa average13.62¢$117
U.S. average17.23¢$15126% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Upland Prairie plant?

Upland Prairie is in Spencer, Clay County, Iowa, at 43.2074° N, 95.3494° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Iowa are similar in size?

Iowa has 123 operable wind plants with 13,410 MW of capacity, and Upland Prairie's 299 MW is 2% of that.

Wind plants in Iowa around this size
PlantCountyMW2025 MWh
Arbor Hill Wind FarmAdair3101,148,002
Ida Grove WindIda3011,078,527
Pioneer Prairie Wind FarmMitchell300859,116
Upland PrairieClay2991,084,946
Pomeroy Wind FarmPocahontas2861,003,340
Lundgren Wind ProjectWebster271604,859
Southern Hills Wind FarmUnion254814,400

Source: EIA Forms EIA-860 and EIA-923, 2025.