Skip to main content
RateWatt

Wind power plant, Iowa

Arbor Hill Wind Farm, Iowa

Arbor Hill Wind Farm is a 310 MW wind power plant in Adair County, Iowa, operated by MidAmerican Energy Co, and it generated 1,148,002 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.5% of the generation reported in Iowa, and its capacity factor sits at the 83rd percentile of U.S. wind plants. By 2025 generation it ranks 680th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

310 MWNameplate capacity
42%Capacity factor, 2025, 83rd percentile, on 310 MW net summer
1.5%Of IA generation, 2025
7 yearsAverage generator age, by MW

How hard does the Arbor Hill Wind Farm plant run compared with other wind plants?

The Arbor Hill Wind Farm plant had a capacity factor of 42% in 2025 on 310 MW of net summer capacity, the 83rd percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 154 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Arbor Hill Wind Farm42%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Arbor Hill Wind Farm plant generating more or less than last year?

Generation at Arbor Hill Wind Farm rose 1.8% from 2024 to 2025, from 1,128,089 MWh to 1,148,002 MWh. Through August 2026 it is running 1.5% behind the same months of 2025.

Net generation by period
PeriodMWh
20241,128,089
20251,148,002
2026 through August736,657
2025, same months747,794
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202653,501
July 202648,841
June 202677,248
May 202689,142
April 2026131,647
March 2026126,947
February 202699,075
January 2026110,256
December 2025119,666
November 2025111,357
October 2025108,657
September 202560,528
August 202550,903
July 202553,244
June 202577,416
May 202581,648
April 2025125,039
March 2025127,674
February 2025115,009
January 2025116,861
December 202496,647
November 2024100,275
October 2024126,220
September 202474,860
August 202457,865
July 202449,489
June 202485,665
May 202469,472
April 2024136,220
March 2024130,564
February 2024108,605
January 202492,207

Source: EIA Form EIA-923, through August 2026.

How much of Iowa's electricity comes from the Arbor Hill Wind Farm plant?

Arbor Hill Wind Farm made 1.5% of the 74,502,373 MWh reported by Iowa plants in 2025, from 1.2% of the state's 24,817 MW of capacity. Its share of output is 1.2 times its share of capacity. By capacity it is the 15th largest of 306 plants in Iowa, the 1,002nd largest of 14,327 in the U.S. and the 49th largest of 1,358 wind plants. By 2025 generation it is the 15th largest of 283 generating plants in the state.

Arbor Hill Wind Farm within Iowa, 2025
MeasureThis plantIowaShare
Capacity (MW)31024,8171.2%
Generation (MWh)1,148,00274,502,3731.5%
Wind capacity (MW)31013,4102.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Arbor Hill Wind Farm plant, and when do they retire?

2 operable generators total 310 MW, with an average age of 7 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s125081%none reported
2020s16019%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
WT1OperatingOnshore Wind Turbine2502018n/a
1OperatingOnshore Wind Turbine602020n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Arbor Hill Wind Farm plant?

EIA lists no joint owners for Arbor Hill Wind Farm. MidAmerican Energy Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does MidAmerican Energy Co charge homes?

MidAmerican Energy Co, the operator of Arbor Hill Wind Farm, had an average residential price of 11.21¢ per kWh and an average bill of $93 a month in 2025, 18% below the Iowa average of 13.62¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Iowa
MidAmerican Energy Co11.21¢$9318% lower
Iowa average13.62¢$117
U.S. average17.23¢$15126% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Arbor Hill Wind Farm plant?

Arbor Hill Wind Farm is in Greenfield, Adair County, Iowa, at 41.4042° N, 94.2614° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Iowa are similar in size?

Iowa has 123 operable wind plants with 13,410 MW of capacity, and Arbor Hill Wind Farm's 310 MW is 2% of that.

Wind plants in Iowa around this size
PlantCountyMW2025 MWh
Beaver Creek WindBoone3401,258,157
North EnglishPoweshiek3401,320,788
Palo Alto Wind FarmPalo Alto3401,454,330
Arbor Hill Wind FarmAdair3101,148,002
Ida Grove WindIda3011,078,527
Pioneer Prairie Wind FarmMitchell300859,116
Upland PrairieClay2991,084,946

Source: EIA Forms EIA-860 and EIA-923, 2025.