Wind power plant, Iowa

North English wind power plant, Iowa

North English is a 340 MW wind power plant in Poweshiek County, Iowa, operated by MidAmerican Energy Co, and it generated 1,320,788 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.8% of the generation reported in Iowa, and its capacity factor sits at the 89th percentile of U.S. wind plants. By 2025 generation it ranks 631st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

340 MWNameplate capacity
44%Capacity factor, 2025, 89th percentile, on 340 MW net summer
1.8%Of IA generation, 2025
7 yearsAverage generator age, by MW

How hard does the North English plant run compared with other wind plants?

The North English plant had a capacity factor of 44% in 2025 on 340 MW of net summer capacity, the 89th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 162 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
North English44%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the North English plant generating more or less than last year?

Generation at North English fell 1.2% from 2024 to 2025, from 1,337,082 MWh to 1,320,788 MWh. Through August 2026 it is running 1.6% behind the same months of 2025.

Net generation by period
PeriodMWh
20241,337,082
20251,320,788
2026 through August856,574
2025, same months870,254
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202659,447
July 202646,682
June 202693,029
May 2026110,306
April 2026157,977
March 2026143,011
February 2026118,202
January 2026127,920
December 2025137,928
November 2025126,949
October 2025124,735
September 202560,922
August 202554,429
July 202554,796
June 202584,696
May 202595,640
April 2025142,069
March 2025159,421
February 2025131,494
January 2025147,709
December 2024115,132
November 2024122,932
October 2024124,913
September 202481,203
August 202468,544
July 202453,325
June 202495,188
May 2024102,693
April 2024167,977
March 2024162,067
February 2024132,715
January 2024110,393

Source: EIA Form EIA-923, through August 2026.

How much of Iowa's electricity comes from the North English plant?

North English made 1.8% of the 74,502,373 MWh reported by Iowa plants in 2025, from 1.4% of the state's 24,817 MW of capacity. Its share of output is 1.3 times its share of capacity. By capacity it is the 12th largest of 306 plants in Iowa, the 950th largest of 14,327 in the U.S. and the 40th largest of 1,358 wind plants. By 2025 generation it is the 13th largest of 283 generating plants in the state.

North English within Iowa, 2025
MeasureThis plantIowaShare
Capacity (MW)34024,8171.4%
Generation (MWh)1,320,78874,502,3731.8%
Wind capacity (MW)34013,4102.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the North English plant, and when do they retire?

2 operable generators total 340 MW, with an average age of 7 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s2340100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GT1OperatingOnshore Wind Turbine2002018n/a
1OperatingOnshore Wind Turbine1402019n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the North English plant?

EIA lists no joint owners for North English. MidAmerican Energy Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does MidAmerican Energy Co charge homes?

MidAmerican Energy Co, the operator of North English, had an average residential price of 11.21¢ per kWh and an average bill of $93 a month in 2025, 18% below the Iowa average of 13.62¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Iowa
MidAmerican Energy Co11.21¢$9318% lower
Iowa average13.62¢$117
U.S. average17.23¢$15126% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the North English plant?

North English is in Montezuma, Poweshiek County, Iowa, at 41.6428° N, 92.4991° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Iowa are similar in size?

Iowa has 123 operable wind plants with 13,410 MW of capacity, and North English's 340 MW is 3% of that.

Wind plants in Iowa around this size
PlantCountyMW2025 MWh
Orient Wind FarmAdair5011,819,787
Rolling Hills Wind FarmCass4841,577,482
Beaver Creek WindBoone3401,258,157
North EnglishPoweshiek3401,320,788
Palo Alto Wind FarmPalo Alto3401,454,330
Arbor Hill Wind FarmAdair3101,148,002
Ida Grove WindIda3011,078,527