Natural gas power plant, Ohio
Woodsdale natural gas power plant, Ohio
Woodsdale is a 572 MW natural gas power plant in Butler County, Ohio, operated by Duke Energy Kentucky Inc, and it generated 321,121 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Ohio, and its capacity factor sits at the 31st percentile of U.S. natural gas plants. By 2025 generation it ranks 1,878th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Woodsdale plant run compared with other natural gas plants?
The Woodsdale plant had a capacity factor of 8% in 2025 on 476 MW of net summer capacity, the 31st percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 28 days at full output out of 365.
0%Shaded: the middle half of natural gas plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Woodsdale | 8% |
| Natural gas plants, 75th percentile | 56% |
| Natural gas plants, median | 22% |
| Natural gas plants, 25th percentile | 6% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Woodsdale plant generating more or less than last year?
Generation at Woodsdale fell 13.5% from 2024 to 2025, from 371,086 MWh to 321,121 MWh. Through August 2026 it is running 87.6% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 371,086 |
| 2025 | 321,121 |
| 2026 through August | 416,637 |
| 2025, same months | 222,102 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 82,197 |
| July 2026 | 89,884 |
| June 2026 | 52,764 |
| May 2026 | 34,546 |
| April 2026 | 54,587 |
| March 2026 | 27,962 |
| February 2026 | 49,284 |
| January 2026 | 25,413 |
| December 2025 | 10,813 |
| November 2025 | 21,820 |
| October 2025 | 35,107 |
| September 2025 | 31,279 |
| August 2025 | 52,230 |
| July 2025 | 75,494 |
| June 2025 | 44,903 |
| May 2025 | 12,928 |
| March 2025 | 13,476 |
| February 2025 | 16,215 |
| January 2025 | 6,856 |
| December 2024 | 2,619 |
| November 2024 | 44,947 |
| October 2024 | 58,046 |
| September 2024 | 30,572 |
| August 2024 | 37,907 |
| July 2024 | 51,642 |
| June 2024 | 22,586 |
| May 2024 | 33,862 |
| April 2024 | 50,731 |
| March 2024 | 16,932 |
| February 2024 | 14,084 |
| January 2024 | 7,158 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Woodsdale plant, and when do they retire?
6 operable generators total 572 MW, with an average age of 33 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1990s | 6 | 572 | 100% | none reported |
Every generator, 6 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GT2 | Operating | Natural Gas Fired Combustion Turbine | 95 | 1992 | n/a |
| GT3 | Operating | Natural Gas Fired Combustion Turbine | 95 | 1992 | n/a |
| GT4 | Operating | Natural Gas Fired Combustion Turbine | 95 | 1992 | n/a |
| GT5 | Operating | Natural Gas Fired Combustion Turbine | 95 | 1992 | n/a |
| GT6 | Operating | Natural Gas Fired Combustion Turbine | 95 | 1992 | n/a |
| GT1 | Operating | Natural Gas Fired Combustion Turbine | 95 | 1993 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Woodsdale plant?
EIA lists no joint owners for Woodsdale. Duke Energy Kentucky Inc operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Woodsdale plant?
Woodsdale is in Trenton, Butler County, Ohio, at 39.4492° N, 84.4611° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which natural gas plants in Ohio are similar in size?
Ohio has 47 operable natural gas plants with 18,398 MW of capacity, and Woodsdale's 572 MW is 3% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Dresden Energy Facility | Muskingum | 678 | 4,189,180 |
| Tait Electric Generating Station | Montgomery | 670 | 954,296 |
| Robert P Mone Plant | Van Wert | 597 | 321,405 |
| Woodsdale | Butler | 572 | 318,677 |
| Darby Power, LLC | Pickaway | 564 | 536,879 |
| Middletown Energy Center | Butler | 544 | 3,144,914 |
| Long Ridge Energy Generation | Monroe | 522 | 3,808,688 |
Source: EIA Forms EIA-860 and EIA-923, 2025.