Skip to main content
RateWatt

Natural gas power plant, Ohio

Long Ridge Energy Generation natural gas power plant, Ohio

Long Ridge Energy Generation is a 522 MW natural gas power plant in Monroe County, Ohio, operated by Long Ridge Energy Generation LLC, and it generated 3,808,688 MWh in 2025 (Forms EIA-860 and EIA-923). That is 2.6% of the generation reported in Ohio, and its capacity factor sits at the 98th percentile of U.S. natural gas plants. By 2025 generation it ranks 303rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

522 MWNameplate capacity
90%Capacity factor, 2025, 98th percentile, on 485 MW net summer
2.6%Of OH generation, 2025
4 yearsAverage generator age, by MW

How hard does the Long Ridge Energy Generation plant run compared with other natural gas plants?

The Long Ridge Energy Generation plant had a capacity factor of 90% in 2025 on 485 MW of net summer capacity, the 98th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 327 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Long Ridge Energy Generation90%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Long Ridge Energy Generation plant generating more or less than last year?

Generation at Long Ridge Energy Generation rose 1.5% from 2024 to 2025, from 3,752,294 MWh to 3,808,688 MWh. Through August 2026 it is running 8.6% behind the same months of 2025.

Net generation by period
PeriodMWh
20243,752,294
20253,808,688
2026 through August2,369,405
2025, same months2,591,172
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026361,228
July 2026354,422
June 2026341,231
May 2026347,143
April 2026212,661
March 202670,175
February 2026325,432
January 2026357,113
December 2025254,767
November 2025350,469
October 2025261,973
September 2025350,307
August 2025317,414
July 2025360,991
June 2025340,535
May 2025189,695
April 2025345,064
March 2025354,143
February 2025326,810
January 2025356,520
December 2024357,836
November 2024295,478
October 2024278,963
September 2024346,472
August 2024360,010
July 2024353,605
June 2024319,438
May 202453,454
April 2024349,370
March 2024353,995
February 2024323,885
January 2024359,788

Source: EIA Form EIA-923, through August 2026.

How much of Ohio's electricity comes from the Long Ridge Energy Generation plant?

Long Ridge Energy Generation made 2.6% of the 145,060,499 MWh reported by Ohio plants in 2025, from 1.5% of the state's 34,392 MW of capacity. Its share of output is 1.7 times its share of capacity. By capacity it is the 27th largest of 215 plants in Ohio, the 712th largest of 14,327 in the U.S. and the 446th largest of 1,962 natural gas plants. By 2025 generation it is the 16th largest of 187 generating plants in the state.

Long Ridge Energy Generation within Ohio, 2025
MeasureThis plantOhioShare
Capacity (MW)52234,3921.5%
Generation (MWh)3,808,688145,060,4992.6%
Natural gas capacity (MW)52218,3982.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Long Ridge Energy Generation plant, and when do they retire?

1 operable generator totals 522 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1522100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
HPPP1OperatingNatural Gas Fired Combined Cycle5222021n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Long Ridge Energy Generation plant?

EIA lists no joint owners for Long Ridge Energy Generation. Long Ridge Energy Generation LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Long Ridge Energy Generation plant?

Long Ridge Energy Generation is in Hannibal, Monroe County, Ohio, at 39.7026° N, 80.8455° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Ohio are similar in size?

Ohio has 47 operable natural gas plants with 18,398 MW of capacity, and Long Ridge Energy Generation's 522 MW is 3% of that.

Natural gas plants in Ohio around this size
PlantCountyMW2025 MWh
WoodsdaleButler572318,677
Darby Power, LLCPickaway564536,879
Middletown Energy CenterButler5443,144,914
Long Ridge Energy GenerationMonroe5223,808,688
Richland (OH)Defiance435367,360
West LorainLorain4251,299,162

Source: EIA Forms EIA-860 and EIA-923, 2025.