Solar power plant, Oregon
Airport Solar power plant, Oregon
Airport Solar is a 47.3 MW solar power plant in Lake County, Oregon, operated by Airport Solar LLC, and it generated 104,354 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Oregon, and its capacity factor sits at the 65th percentile of U.S. solar plants. By 2025 generation it ranks 3,345th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Airport Solar plant run compared with other solar plants?
The Airport Solar plant had a capacity factor of 25% in 2025 on 47.3 MW of net summer capacity, the 65th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 92 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Airport Solar | 25% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Airport Solar plant generating more or less than last year?
Generation at Airport Solar rose 2.0% from 2024 to 2025, from 102,288 MWh to 104,354 MWh. Through August 2026 it is running 11.7% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 102,288 |
| 2025 | 104,354 |
| 2026 through August | 69,976 |
| 2025, same months | 79,211 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 7,389 |
| July 2026 | 5,502 |
| June 2026 | 13,734 |
| May 2026 | 14,094 |
| April 2026 | 10,309 |
| March 2026 | 9,624 |
| February 2026 | 4,496 |
| January 2026 | 4,828 |
| December 2025 | 3,496 |
| November 2025 | 4,602 |
| October 2025 | 7,161 |
| September 2025 | 9,884 |
| August 2025 | 13,411 |
| July 2025 | 12,583 |
| June 2025 | 13,391 |
| May 2025 | 14,022 |
| April 2025 | 11,151 |
| March 2025 | 6,711 |
| February 2025 | 2,916 |
| January 2025 | 5,026 |
| December 2024 | 3,393 |
| November 2024 | 3,217 |
| October 2024 | 7,067 |
| September 2024 | 10,724 |
| August 2024 | 12,953 |
| July 2024 | 10,260 |
| June 2024 | 12,666 |
| May 2024 | 14,706 |
| April 2024 | 10,413 |
| March 2024 | 8,659 |
| February 2024 | 5,155 |
| January 2024 | 3,075 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Airport Solar plant, and when do they retire?
1 operable generator totals 47.3 MW, with an average age of 6 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 47 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| APS | Operating | Solar Photovoltaic | 47 | 2019 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Airport Solar plant?
EIA lists no joint owners for Airport Solar. Airport Solar LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Airport Solar plant?
Airport Solar is in Lakeview, Lake County, Oregon, at 42.1702° N, 120.4023° W. It sits in the PacifiCorp - West balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Oregon are similar in size?
Oregon has 148 operable solar plants with 1,245 MW of capacity, and Airport Solar's 47.3 MW is 4% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Skysol | Klamath | 61 | 118,147 |
| Bakeoven Solar | Wasco | 60 | 71,710 |
| Solar Star Oregon II | Crook | 56 | 124,738 |
| Airport Solar | Lake | 47 | 104,354 |
| Prineville Solar Energy LLC | Crook | 40 | 97,958 |
Source: EIA Forms EIA-860 and EIA-923, 2025.