Bakeoven Solar is a 60 MW solar power plant in Wasco County, Oregon, operated by Avangrid Power LLC, and it generated 71,710 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Oregon, and its capacity factor sits at the 10th percentile of U.S. solar plants. By 2025 generation it ranks 3,743rd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Bakeoven Solar plant run compared with other solar plants?
The Bakeoven Solar plant had a capacity factor of 14% in 2025 on 60 MW of net summer capacity, the 10th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 50 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Bakeoven Solar | 14% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Bakeoven Solar plant generating more or less than last year?
Bakeoven Solar generated 71,710 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 184.5% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 71,710 |
| 2026 through August | 113,259 |
| 2025, same months | 39,808 |
Monthly generation, Jul 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 18,730 |
| July 2026 | 20,226 |
| June 2026 | 19,617 |
| May 2026 | 18,396 |
| April 2026 | 14,808 |
| March 2026 | 11,603 |
| February 2026 | 5,945 |
| January 2026 | 3,934 |
| December 2025 | 3,936 |
| November 2025 | 4,883 |
| October 2025 | 9,185 |
| September 2025 | 13,898 |
| August 2025 | 18,079 |
| July 2025 | 21,729 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Bakeoven Solar plant, and when do they retire?
1 operable generator totals 60 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 60 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| BOS1 | Operating | Solar Photovoltaic | 60 | 2023 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Bakeoven Solar plant?
EIA lists no joint owners for Bakeoven Solar. Avangrid Power LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Bakeoven Solar plant?
Bakeoven Solar is in Maupin, Wasco County, Oregon, at 45.1318° N, 120.8807° W. It sits in the Avangrid Renewables LLC balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Oregon are similar in size?
Oregon has 148 operable solar plants with 1,245 MW of capacity, and Bakeoven Solar's 60 MW is 5% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Millican Solar Energy LLC | Crook | 70 | 142,911 |
| Skysol | Klamath | 61 | 118,147 |
| Bakeoven Solar | Wasco | 60 | 71,710 |
| Solar Star Oregon II | Crook | 56 | 124,738 |
| Airport Solar | Lake | 47 | 104,354 |
| Prineville Solar Energy LLC | Crook | 40 | 97,958 |