Skip to main content
RateWatt

Solar power plant, Oregon

Prineville Solar Energy LLC power plant, Oregon

Prineville Solar Energy LLC is a 40 MW solar power plant in Crook County, Oregon, operated by Invenergy Services LLC, and it generated 97,958 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Oregon, and its capacity factor sits at the 59th percentile of U.S. solar plants. By 2025 generation it ranks 3,420th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

40 MWNameplate capacity
24%Capacity factor, 2025, 59th percentile, on 46.2 MW net summer
0.2%Of OR generation, 2025
4 yearsAverage generator age, by MW

How hard does the Prineville Solar Energy LLC plant run compared with other solar plants?

The Prineville Solar Energy LLC plant had a capacity factor of 24% in 2025 on 46.2 MW of net summer capacity, the 59th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 88 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Prineville Solar Energy LLC24%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Prineville Solar Energy LLC plant generating more or less than last year?

Generation at Prineville Solar Energy LLC rose 9.3% from 2024 to 2025, from 89,651 MWh to 97,958 MWh. Through August 2026 it is running 2.3% behind the same months of 2025.

Net generation by period
PeriodMWh
202489,651
202597,958
2026 through August74,821
2025, same months76,618
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202612,364
July 202612,808
June 202612,899
May 202612,494
April 20269,547
March 20267,444
February 20264,180
January 20263,085
December 20252,518
November 20253,620
October 20256,150
September 20259,052
August 202511,478
July 202513,855
June 202513,289
May 202512,111
April 202510,978
March 20256,532
February 20254,497
January 20253,878
December 20242,260
November 20242,998
October 20245,853
September 20248,092
August 202410,656
July 202412,394
June 202411,419
May 202412,076
April 20249,297
March 20247,846
February 20244,135
January 20242,625

Source: EIA Form EIA-923, through August 2026.

How much of Oregon's electricity comes from the Prineville Solar Energy LLC plant?

Prineville Solar Energy LLC made 0.2% of the 64,124,656 MWh reported by Oregon plants in 2025, from 0.2% of the state's 19,040 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 64th largest of 302 plants in Oregon, the 4,074th largest of 14,327 in the U.S. and the 970th largest of 7,223 solar plants. By 2025 generation it is the 66th largest of 278 generating plants in the state.

Prineville Solar Energy LLC within Oregon, 2025
MeasureThis plantOregonShare
Capacity (MW)4019,0400.2%
Generation (MWh)97,95864,124,6560.2%
Solar capacity (MW)401,2453.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Prineville Solar Energy LLC plant, and when do they retire?

1 operable generator totals 40 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s140100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN1OperatingSolar Photovoltaic402021n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Prineville Solar Energy LLC plant?

EIA lists no joint owners for Prineville Solar Energy LLC. Invenergy Services LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Prineville Solar Energy LLC plant?

Prineville Solar Energy LLC is in Prineville, Crook County, Oregon, at 44.1633° N, 120.5241° W. It sits in the PacifiCorp - West balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Oregon are similar in size?

Oregon has 148 operable solar plants with 1,245 MW of capacity, and Prineville Solar Energy LLC's 40 MW is 3% of that.

Solar plants in Oregon around this size
PlantCountyMW2025 MWh
Bakeoven SolarWasco6071,710
Solar Star Oregon IICrook56124,738
Airport SolarLake47104,354
Prineville Solar Energy LLCCrook4097,958

Source: EIA Forms EIA-860 and EIA-923, 2025.