Wind power plant, Texas

Astra Wind Farm, Texas

Astra Wind Farm is a 163 MW wind power plant in Randall County, Texas, operated by Astra Wind LLC, and it generated 546,087 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 67th percentile of U.S. wind plants. By 2025 generation it ranks 1,252nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

163 MWNameplate capacity
38%Capacity factor, 2025, 67th percentile, on 163 MW net summer
0.1%Of TX generation, 2025
8 yearsAverage generator age, by MW

How hard does the Astra Wind Farm plant run compared with other wind plants?

The Astra Wind Farm plant had a capacity factor of 38% in 2025 on 163 MW of net summer capacity, the 67th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 140 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Astra Wind Farm38%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Astra Wind Farm plant generating more or less than last year?

Generation at Astra Wind Farm fell 6.5% from 2024 to 2025, from 583,823 MWh to 546,087 MWh. Through August 2026 it is running 12.2% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024583,823
2025546,087
2026 through August400,793
2025, same months357,198
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202651,193
July 202646,508
June 202653,270
May 202632,469
April 202658,520
March 202661,005
February 202651,839
January 202645,989
December 202548,854
November 202548,616
October 202549,030
September 202542,389
August 202545,407
July 202537,612
June 202543,466
May 202541,697
April 202549,373
March 202547,276
February 202543,762
January 202548,605
December 202447,384
November 202446,489
October 202447,666
September 202440,179
August 202445,550
July 202443,764
June 202453,074
May 202453,927
April 202450,384
March 202455,112
February 202455,063
January 202445,231

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Astra Wind Farm plant?

Astra Wind Farm made 0.1% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. By capacity it is the 386th largest of 1,023 plants in Texas, the 1,869th largest of 14,327 in the U.S. and the 398th largest of 1,358 wind plants. By 2025 generation it is the 255th largest of 816 generating plants in the state.

Astra Wind Farm within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)163195,9660.1%
Generation (MWh)546,087592,896,1760.1%
Wind capacity (MW)16343,9420.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Astra Wind Farm plant, and when do they retire?

1 operable generator totals 163 MW, with an average age of 8 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1163100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
ASTRAOperatingOnshore Wind Turbine1632017n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Astra Wind Farm plant?

EIA lists no joint owners for Astra Wind Farm. Astra Wind LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Astra Wind Farm plant?

Astra Wind Farm is in Happy, Randall County, Texas, at 34.7695° N, 102.0524° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Texas are similar in size?

Texas has 228 operable wind plants with 43,942 MW of capacity, and Astra Wind Farm's 163 MW is 0% of that.

Wind plants in Texas around this size
PlantCountyMW2025 MWh
Hackberry Wind FarmShackelford166228,393
Cameron Wind 1 LLCCameron165350,743
Prairie Switch Wind LLCWharton163292,055
Astra Wind FarmRandall163546,087
Midway Wind, LLCSan Patricio163403,744
Wildorado Wind LLCOldham161672,453
Spinning Spur Wind LLCOldham161346,997

Source: EIA Forms EIA-860 and EIA-923, 2025.