Wind power plant, Texas
Prairie Switch Wind LLC power plant, Texas
Prairie Switch Wind LLC is a 163 MW wind power plant in Wharton County, Texas, operated by Prairie Switch Wind LLC, and it generated 292,055 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 12th percentile of U.S. wind plants. By 2025 generation it ranks 2,013th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Prairie Switch Wind LLC plant run compared with other wind plants?
The Prairie Switch Wind LLC plant had a capacity factor of 20% in 2025 on 163 MW of net summer capacity, the 12th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 75 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Prairie Switch Wind LLC | 20% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Prairie Switch Wind LLC plant generating more or less than last year?
Prairie Switch Wind LLC generated 292,055 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 157.2% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 292,055 |
| 2026 through August | 365,952 |
| 2025, same months | 142,256 |
Monthly generation, May 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 32,245 |
| July 2026 | 30,028 |
| June 2026 | 34,943 |
| May 2026 | 39,560 |
| April 2026 | 54,815 |
| March 2026 | 64,462 |
| February 2026 | 51,247 |
| January 2026 | 58,652 |
| December 2025 | 47,021 |
| November 2025 | 50,536 |
| October 2025 | 31,524 |
| September 2025 | 20,718 |
| August 2025 | 18,310 |
| July 2025 | 36,664 |
| June 2025 | 35,166 |
| May 2025 | 52,116 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Prairie Switch Wind LLC plant, and when do they retire?
1 operable generator totals 163 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 163 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| PSW1 | Operating | Onshore Wind Turbine | 163 | 2025 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Prairie Switch Wind LLC plant?
Fengate Asset Management is the only joint owner reported for Prairie Switch Wind LLC, with 100.0%. Prairie Switch Wind LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Prairie Switch Wind LLC plant?
Prairie Switch Wind LLC is in El Campo, Wharton County, Texas, at 29.0919° N, 96.0900° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Texas are similar in size?
Texas has 228 operable wind plants with 43,942 MW of capacity, and Prairie Switch Wind LLC's 163 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Hart Wind | Castro | 166 | 343,988 |
| Hackberry Wind Farm | Shackelford | 166 | 228,393 |
| Cameron Wind 1 LLC | Cameron | 165 | 350,743 |
| Prairie Switch Wind LLC | Wharton | 163 | 292,055 |
| Astra Wind Farm | Randall | 163 | 546,087 |
| Midway Wind, LLC | San Patricio | 163 | 403,744 |
| Wildorado Wind LLC | Oldham | 161 | 672,453 |
Source: EIA Forms EIA-860 and EIA-923, 2025.