Wind power plant, Texas
Hackberry Wind Farm, Texas
Hackberry Wind Farm is a 166 MW wind power plant in Shackelford County, Texas, operated by Hackberry Wind LLC, and it generated 228,393 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 5th percentile of U.S. wind plants. By 2025 generation it ranks 2,325th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Hackberry Wind Farm plant run compared with other wind plants?
The Hackberry Wind Farm plant had a capacity factor of 16% in 2025 on 162 MW of net summer capacity, the 5th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 59 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Hackberry Wind Farm | 16% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Hackberry Wind Farm plant generating more or less than last year?
Generation at Hackberry Wind Farm fell 29.9% from 2024 to 2025, from 325,680 MWh to 228,393 MWh.
| Period | MWh |
|---|---|
| 2024 | 325,680 |
| 2025 | 228,393 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 10,160 |
| November 2025 | 6,572 |
| October 2025 | 5,196 |
| September 2025 | 7,932 |
| August 2025 | 10,685 |
| July 2025 | 14,027 |
| June 2025 | 26,436 |
| May 2025 | 23,649 |
| April 2025 | 35,681 |
| March 2025 | 33,640 |
| February 2025 | 25,671 |
| January 2025 | 28,744 |
| December 2024 | 27,643 |
| November 2024 | 29,187 |
| October 2024 | 34,788 |
| September 2024 | 17,073 |
| August 2024 | 22,702 |
| July 2024 | 24,601 |
| June 2024 | 21,791 |
| May 2024 | 23,466 |
| April 2024 | 10,507 |
| March 2024 | 37,602 |
| February 2024 | 43,808 |
| January 2024 | 32,512 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Hackberry Wind Farm plant, and when do they retire?
1 operable generator totals 166 MW, with an average age of 17 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 1 | 166 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| HWFG1 | Operating | Onshore Wind Turbine | 166 | 2008 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Hackberry Wind Farm plant?
EIA lists no joint owners for Hackberry Wind Farm. Hackberry Wind LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Hackberry Wind Farm plant?
Hackberry Wind Farm is in Albany, Shackelford County, Texas, at 32.7683° N, 99.4228° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Texas are similar in size?
Texas has 228 operable wind plants with 43,942 MW of capacity, and Hackberry Wind Farm's 166 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Turkey Track Wind Energy LLC | Nolan | 170 | 331,425 |
| Desert Sky | Pecos | 168 | 541,153 |
| Hart Wind | Castro | 166 | 343,988 |
| Hackberry Wind Farm | Shackelford | 166 | 228,393 |
| Cameron Wind 1 LLC | Cameron | 165 | 350,743 |
| Prairie Switch Wind LLC | Wharton | 163 | 292,055 |
| Astra Wind Farm | Randall | 163 | 546,087 |
Source: EIA Forms EIA-860 and EIA-923, 2025.