Cameron Wind 1 LLC is a 181 MW power plant, 165 MW of it wind, in Cameron County, Texas, operated by Cameron Wind 1 LLC, and it generated 348,206 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 20th percentile of U.S. wind plants. By 2025 generation it ranks 1,775th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Cameron Wind 1 LLC plant run compared with other wind plants?
The Cameron Wind 1 LLC plant's wind units had a capacity factor of 24% in 2025 on 165 MW of net summer capacity, the 20th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 89 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Cameron Wind 1 LLC | 24% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its wind generators only. Values above 105% are left out of the comparison.
Is the Cameron Wind 1 LLC plant generating more or less than last year?
Generation at Cameron Wind 1 LLC rose 3.1% from 2024 to 2025, from 337,600 MWh to 348,206 MWh.
| Period | MWh |
|---|---|
| 2024 | 337,600 |
| 2025 | 348,206 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 17,621 |
| November 2025 | 28,347 |
| October 2025 | 16,678 |
| September 2025 | 9,812 |
| August 2025 | 16,531 |
| July 2025 | 29,470 |
| June 2025 | 21,192 |
| May 2025 | 32,135 |
| April 2025 | 51,868 |
| March 2025 | 46,826 |
| February 2025 | 39,812 |
| January 2025 | 37,914 |
| December 2024 | 26,733 |
| November 2024 | 30,901 |
| October 2024 | 17,382 |
| September 2024 | 21,045 |
| August 2024 | 13,383 |
| July 2024 | 22,274 |
| June 2024 | 26,246 |
| May 2024 | 31,283 |
| April 2024 | 40,151 |
| March 2024 | 33,598 |
| February 2024 | 39,899 |
| January 2024 | 34,705 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Cameron Wind 1 LLC plant, and when do they retire?
2 operable generators total 181 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 165 | 91% | none reported |
| 2020s | 1 | 16 | 9% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| CAM1 | Operating | Onshore Wind Turbine | 165 | 2015 | n/a |
| SABAL | Operating | Batteries | 16 | 2024 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Cameron Wind 1 LLC plant?
EIA lists no joint owners for Cameron Wind 1 LLC. Cameron Wind 1 LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Cameron Wind 1 LLC plant use?
Cameron Wind 1 LLC has capacity on 2 fuels: 91% wind and 9% battery and pumped storage. In 2025, wind made 101% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Wind | 165 | 91.0% | 350,743 |
| Battery and pumped storage | 16 | 9.0% | -2,537 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Cameron Wind 1 LLC plant?
Cameron Wind 1 LLC is in Rio Hondo, Cameron County, Texas, at 26.1953° N, 97.4661° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Texas are similar in size?
Texas has 228 operable wind plants with 43,942 MW of capacity, and Cameron Wind 1 LLC's 165 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Desert Sky | Pecos | 168 | 541,153 |
| Hart Wind | Castro | 166 | 343,988 |
| Hackberry Wind Farm | Shackelford | 166 | 228,393 |
| Cameron Wind 1 LLC | Cameron | 165 | 350,743 |
| Prairie Switch Wind LLC | Wharton | 163 | 292,055 |
| Astra Wind Farm | Randall | 163 | 546,087 |
| Midway Wind, LLC | San Patricio | 163 | 403,744 |
Source: EIA Forms EIA-860 and EIA-923, 2025.