Wind power plant, Illinois
Big Sky Wind LLC power plant, Illinois
Big Sky Wind LLC is a 239 MW wind power plant in Bureau County, Illinois, operated by Big Sky Wind LLC, and it generated 816,633 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in Illinois, and its capacity factor sits at the 70th percentile of U.S. wind plants. By 2025 generation it ranks 861st of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Big Sky Wind LLC plant run compared with other wind plants?
The Big Sky Wind LLC plant had a capacity factor of 39% in 2025 on 239 MW of net summer capacity, the 70th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 142 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Big Sky Wind LLC | 39% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Big Sky Wind LLC plant generating more or less than last year?
Generation at Big Sky Wind LLC rose 11.7% from 2024 to 2025, from 730,889 MWh to 816,633 MWh.
| Period | MWh |
|---|---|
| 2024 | 730,889 |
| 2025 | 816,633 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 91,122 |
| November 2025 | 83,584 |
| October 2025 | 81,723 |
| September 2025 | 25,444 |
| August 2025 | 30,361 |
| July 2025 | 31,693 |
| June 2025 | 38,624 |
| May 2025 | 65,625 |
| April 2025 | 89,776 |
| March 2025 | 105,910 |
| February 2025 | 76,809 |
| January 2025 | 95,962 |
| December 2024 | 81,905 |
| November 2024 | 81,361 |
| October 2024 | 64,322 |
| September 2024 | 39,132 |
| August 2024 | 32,059 |
| July 2024 | 27,019 |
| June 2024 | 59,828 |
| May 2024 | 71,153 |
| April 2024 | 73,799 |
| March 2024 | 85,783 |
| February 2024 | 50,167 |
| January 2024 | 64,361 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Big Sky Wind LLC plant, and when do they retire?
1 operable generator totals 239 MW, with an average age of 14 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 239 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Onshore Wind Turbine | 239 | 2011 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Big Sky Wind LLC plant?
EIA lists no joint owners for Big Sky Wind LLC. Big Sky Wind LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Big Sky Wind LLC plant?
Big Sky Wind LLC is in Ohio, Bureau County, Illinois, at 41.5992° N, 89.4561° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Illinois are similar in size?
Illinois has 55 operable wind plants with 8,458 MW of capacity, and Big Sky Wind LLC's 239 MW is 3% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Radfords Run Wind Farm | Dewitt | 278 | 1,147,008 |
| Sapphire Sky Wind Energy LLC | DeWitt | 260 | 925,776 |
| Blooming Grove Wind Energy Center | Livingston | 250 | 866,027 |
| Big Sky Wind LLC | Bureau | 239 | 816,633 |
| FPL Energy Illinois Wind LLC Hybrid | DeKalb | 218 | 632,162 |
| California Ridge Wind Energy LLC | Vermilion | 217 | 653,394 |
| Old Trail Wind Farm | McLean | 214 | 556,306 |
Source: EIA Forms EIA-860 and EIA-923, 2025.