Skip to main content
RateWatt

Wind power plant, Illinois

Blooming Grove Wind Energy Center, Illinois

Blooming Grove Wind Energy Center is a 250 MW wind power plant in Livingston County, Illinois, operated by Invenergy Services LLC, and it generated 866,027 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.5% of the generation reported in Illinois, and its capacity factor sits at the 71st percentile of U.S. wind plants. By 2025 generation it ranks 818th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

250 MWNameplate capacity
40%Capacity factor, 2025, 71st percentile, on 250 MW net summer
0.5%Of IL generation, 2025
5 yearsAverage generator age, by MW

How hard does the Blooming Grove Wind Energy Center plant run compared with other wind plants?

The Blooming Grove Wind Energy Center plant had a capacity factor of 40% in 2025 on 250 MW of net summer capacity, the 71st percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 144 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Blooming Grove Wind Energy Center40%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Blooming Grove Wind Energy Center plant generating more or less than last year?

Generation at Blooming Grove Wind Energy Center fell 0.5% from 2024 to 2025, from 870,494 MWh to 866,027 MWh. Through August 2026 it is running 3.8% behind the same months of 2025.

Net generation by period
PeriodMWh
2024870,494
2025866,027
2026 through August540,466
2025, same months561,852
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202632,730
July 202626,895
June 202650,033
May 202637,688
April 2026100,262
March 2026108,413
February 202678,710
January 2026105,735
December 202597,919
November 202593,041
October 202584,582
September 202528,633
August 202533,804
July 202530,746
June 202550,643
May 202572,706
April 202577,654
March 2025106,883
February 202588,005
January 2025101,411
December 2024101,709
November 202496,333
October 202488,347
September 202439,548
August 202441,266
July 202426,956
June 202432,076
May 202465,943
April 2024102,204
March 2024107,858
February 202483,338
January 202484,916

Source: EIA Form EIA-923, through August 2026.

How much of Illinois' electricity comes from the Blooming Grove Wind Energy Center plant?

Blooming Grove Wind Energy Center made 0.5% of the 191,710,915 MWh reported by Illinois plants in 2025, from 0.5% of the state's 52,515 MW of capacity. By capacity it is the 48th largest of 602 plants in Illinois, the 1,239th largest of 14,327 in the U.S. and the 145th largest of 1,358 wind plants. By 2025 generation it is the 24th largest of 531 generating plants in the state.

Blooming Grove Wind Energy Center within Illinois, 2025
MeasureThis plantIllinoisShare
Capacity (MW)25052,5150.5%
Generation (MWh)866,027191,710,9150.5%
Wind capacity (MW)2508,4583.0%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Blooming Grove Wind Energy Center plant, and when do they retire?

1 operable generator totals 250 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1250100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN1OperatingOnshore Wind Turbine2502020n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Blooming Grove Wind Energy Center plant?

EIA lists no joint owners for Blooming Grove Wind Energy Center. Invenergy Services LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Blooming Grove Wind Energy Center plant?

Blooming Grove Wind Energy Center is in Chenoa, Livingston County, Illinois, at 40.6611° N, 88.3951° W. It sits in the PJM Interconnection, LLC balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Illinois are similar in size?

Illinois has 55 operable wind plants with 8,458 MW of capacity, and Blooming Grove Wind Energy Center's 250 MW is 3% of that.

Wind plants in Illinois around this size
PlantCountyMW2025 MWh
Prosperity WindPiatt300678,212
Radfords Run Wind FarmDewitt2781,147,008
Sapphire Sky Wind Energy LLCDeWitt260925,776
Blooming Grove Wind Energy CenterLivingston250866,027
Big Sky Wind LLCBureau239816,633
FPL Energy Illinois Wind LLC HybridDeKalb218632,162
California Ridge Wind Energy LLCVermilion217653,394

Source: EIA Forms EIA-860 and EIA-923, 2025.