Wind power plant, Illinois
FPL Energy Illinois Wind LLC Hybrid power plant, Illinois
FPL Energy Illinois Wind LLC Hybrid is a 238 MW power plant, 218 MW of it wind, in DeKalb County, Illinois, operated by FPL Energy Illinois Wind LLC, and it generated 630,227 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Illinois, and its capacity factor sits at the 51st percentile of U.S. wind plants. By 2025 generation it ranks 1,088th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the FPL Energy Illinois Wind LLC Hybrid plant run compared with other wind plants?
The FPL Energy Illinois Wind LLC Hybrid plant's wind units had a capacity factor of 33% in 2025 on 218 MW of net summer capacity, the 51st percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 121 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| FPL Energy Illinois Wind LLC Hybrid | 33% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its wind generators only. Values above 105% are left out of the comparison.
Is the FPL Energy Illinois Wind LLC Hybrid plant generating more or less than last year?
Generation at FPL Energy Illinois Wind LLC Hybrid rose 1.5% from 2024 to 2025, from 620,883 MWh to 630,227 MWh. Through August 2026 it is running 3.6% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 620,883 |
| 2025 | 630,227 |
| 2026 through August | 393,927 |
| 2025, same months | 408,832 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 26,198 |
| July 2026 | 21,157 |
| June 2026 | 42,450 |
| May 2026 | 51,236 |
| April 2026 | 65,740 |
| March 2026 | 69,173 |
| February 2026 | 50,902 |
| January 2026 | 67,071 |
| December 2025 | 71,071 |
| November 2025 | 69,106 |
| October 2025 | 55,381 |
| September 2025 | 25,837 |
| August 2025 | 25,336 |
| July 2025 | 23,048 |
| June 2025 | 38,010 |
| May 2025 | 48,368 |
| April 2025 | 69,468 |
| March 2025 | 76,930 |
| February 2025 | 57,232 |
| January 2025 | 70,440 |
| December 2024 | 61,320 |
| November 2024 | 61,750 |
| October 2024 | 62,032 |
| September 2024 | 32,824 |
| August 2024 | 28,386 |
| July 2024 | 18,327 |
| June 2024 | 48,116 |
| May 2024 | 55,172 |
| April 2024 | 67,140 |
| March 2024 | 70,876 |
| February 2024 | 56,389 |
| January 2024 | 58,551 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the FPL Energy Illinois Wind LLC Hybrid plant, and when do they retire?
2 operable generators total 238 MW, with an average age of 16 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 1 | 218 | 92% | none reported |
| 2010s | 1 | 20 | 8% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GE1.5 | Operating | Onshore Wind Turbine | 218 | 2009 | n/a |
| BFT | Operating | Batteries | 20 | 2014 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the FPL Energy Illinois Wind LLC Hybrid plant?
EIA lists no joint owners for FPL Energy Illinois Wind LLC Hybrid. FPL Energy Illinois Wind LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the FPL Energy Illinois Wind LLC Hybrid plant use?
FPL Energy Illinois Wind LLC Hybrid has capacity on 2 fuels: 92% wind and 8% battery and pumped storage. In 2025, wind made 100% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Wind | 218 | 91.6% | 632,162 |
| Battery and pumped storage | 20 | 8.4% | -1,935 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the FPL Energy Illinois Wind LLC Hybrid plant?
FPL Energy Illinois Wind LLC Hybrid is in Shabbona, DeKalb County, Illinois, at 41.7678° N, 88.8867° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Illinois are similar in size?
Illinois has 55 operable wind plants with 8,458 MW of capacity, and FPL Energy Illinois Wind LLC Hybrid's 218 MW is 3% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Sapphire Sky Wind Energy LLC | DeWitt | 260 | 925,776 |
| Blooming Grove Wind Energy Center | Livingston | 250 | 866,027 |
| Big Sky Wind LLC | Bureau | 239 | 816,633 |
| FPL Energy Illinois Wind LLC Hybrid | DeKalb | 218 | 632,162 |
| California Ridge Wind Energy LLC | Vermilion | 217 | 653,394 |
| Old Trail Wind Farm | McLean | 214 | 556,306 |
| Walnut Ridge Wind Farm | Bureau | 212 | 754,700 |
Source: EIA Forms EIA-860 and EIA-923, 2025.