Skip to main content
RateWatt

Solar power plant, Nevada

Boulder Solar Power, LLC power plant, Nevada

Boulder Solar Power, LLC is a 100 MW solar power plant in Clark County, Nevada, operated by Southern Power Co, and it generated 275,123 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.6% of the generation reported in Nevada, and its capacity factor sits at the 95th percentile of U.S. solar plants. By 2025 generation it ranks 2,084th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

100 MWNameplate capacity
31%Capacity factor, 2025, 95th percentile, on 100 MW net summer
0.6%Of NV generation, 2025
9 yearsAverage generator age, by MW

How hard does the Boulder Solar Power, LLC plant run compared with other solar plants?

The Boulder Solar Power, LLC plant had a capacity factor of 31% in 2025 on 100 MW of net summer capacity, the 95th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 115 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Boulder Solar Power, LLC31%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Boulder Solar Power, LLC plant generating more or less than last year?

Generation at Boulder Solar Power, LLC rose 1.7% from 2024 to 2025, from 270,582 MWh to 275,123 MWh. Through August 2026 it is running 1.1% behind the same months of 2025.

Net generation by period
PeriodMWh
2024270,582
2025275,123
2026 through August201,673
2025, same months204,004
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202625,512
July 202629,658
June 202630,277
May 202632,832
April 202627,966
March 202624,946
February 202616,356
January 202614,126
December 202512,987
November 202513,388
October 202521,637
September 202523,107
August 202527,489
July 202531,100
June 202531,005
May 202530,501
April 202527,899
March 202522,841
February 202517,772
January 202515,397
December 202412,925
November 202415,483
October 202420,998
September 202424,764
August 202427,677
July 202430,022
June 202432,920
May 202429,090
April 202428,556
March 202421,341
February 202414,554
January 202412,252

Source: EIA Form EIA-923, through August 2026.

How much of Nevada's electricity comes from the Boulder Solar Power, LLC plant?

Boulder Solar Power, LLC made 0.6% of the 45,180,066 MWh reported by Nevada plants in 2025, from 0.5% of the state's 18,959 MW of capacity. By capacity it is the 41st largest of 117 plants in Nevada, the 2,602nd largest of 14,327 in the U.S. and the 436th largest of 7,223 solar plants. By 2025 generation it is the 37th largest of 112 generating plants in the state.

Boulder Solar Power, LLC within Nevada, 2025
MeasureThis plantNevadaShare
Capacity (MW)10018,9590.5%
Generation (MWh)275,12345,180,0660.6%
Solar capacity (MW)1005,1951.9%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Boulder Solar Power, LLC plant, and when do they retire?

1 operable generator totals 100 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1100100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
BSPOperatingSolar Photovoltaic1002016n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Boulder Solar Power, LLC plant?

Boulder Solar Power, LLC is the only joint owner reported for Boulder Solar Power, LLC, with 100.0%. Southern Power Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Boulder Solar Power, LLC plant?

Boulder Solar Power, LLC is in Boulder City, Clark County, Nevada, at 35.8340° N, 114.9700° W. It sits in the Nevada Power Company balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Nevada are similar in size?

Nevada has 58 operable solar plants with 5,195 MW of capacity, and Boulder Solar Power, LLC's 100 MW is 2% of that.

Solar plants in Nevada around this size
PlantCountyMW2025 MWh
Sunshine Valley SolarNye104264,140
Battle Mountain Solar ProjectHumboldt101274,057
Playa Solar 2Clark100255,099
Boulder Solar Power, LLCClark100275,123
Techren Solar I LLCClark100224,064
Harry Allen Solar Energy LLCClark100296,941
Fish SpringsWashoe100220,393

Source: EIA Forms EIA-860 and EIA-923, 2025.